MIDRANGE dot COM Mailing List Archive



Home » MIDRANGE-L » April 2014

Re: Distribute IBM i on available disk units Was: 70GB load source and 5 other drives



fixed

Again, doing the unload/reload utilizing one large load source and
multiple smaller virtual drives.

Utilizing "Checklist 20: Recovering your entire system after a complete
system
loss" from the recovery guide.

At which point do you run:
STRASPBAL TYPE(*ENDALC)
of the load source?

1: After Task 8: Restore the operating system, beginning with “Task 1:
Starting to restore the
operating system”?

2: In the middle of the task 8 above? If so, at which step?

When?


Rob Berendt





Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2014 by MIDRANGE dot COM and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available here. If you have questions about this, please contact