|
Roger, No chance that users have created more sessions than you allow on the PC side ? This could hog addresses... Guess you would see this on the AS/400-side if there are a bunch of new Device Descriptions... Chuck Chuck "Roger Vicker, CCP" wrote: > Hello, > > Has anyone seen this strange one. > > Perle 494 with 5 twinax cards and at version 3.91, to a Vanguard 100 > router, to frame relay, to AS/400 620 V4R4M0. > > Multiple PCs using Client Access V3R2M0 and service pack SF64050, > Perle/Affinity PCI Twinax Cards, twisted pair, and powered hubs. All > this has been working fairly well for months. (Occasional session > freeze/drop) > > Several PCs are connected to the AS/400. Another PC tries to connect > but gets a message that there was a communications error while > verifying security (or to that effect). If I move the PC to another > port on the same controller I get the same thing. Move it to another > controller and it gets in so the wire and card must be good. > > While this is going on some (but not all) of the users that are > connected report that they can only get 2 or 3 sessions active. I > watched as user 1 started A then B and tried C but got a blank screen. > Then watched user 2, without anything else changed or ended, start A > then B then C and get only a blank screen for D. To make this stranger > still after user 3 couldn't get in at all, user 1 disconnected > completely and then user 3 could connect but user 1 could no longer > get in. Reverse it, user 3 disconnects and user 1 could connect. > > I checked the MODD QPCSUPP and it was set for 256/256. System value > QUTORMT shouldn't be a problem because it was set at 500 and all the > devices had been created a long time ago and had been in use before > today. > > After several hours of chasing ghosts I shut down the Perle over > lunch, varied everything off, powered up the Perle, and varied > everything on. This let almost everyone that had problems in but a few > are still limited to 1 session or having problems getting connected. > Any Ideas would be greatly appreciated. > > I am about ready to tell them to shut the plant down for the 30 days > left until Sprint delivers a new router so I can move them to CA > Express over TCP. > > Roger Vicker, CCP > > -- > *** Vicker Programming and Service *** Have bits will byte *** > www.vicker.com *** > Please be sure to exit before leaving. - Jack Treger > > +--- > | This is the Midrange System Mailing List! > | To submit a new message, send your mail to MIDRANGE-L@midrange.com. > | To subscribe to this list send email to MIDRANGE-L-SUB@midrange.com. > | To unsubscribe from this list send email to MIDRANGE-L-UNSUB@midrange.com. > | Questions should be directed to the list owner/operator: david@midrange.com > +--- +--- | This is the Midrange System Mailing List! | To submit a new message, send your mail to MIDRANGE-L@midrange.com. | To subscribe to this list send email to MIDRANGE-L-SUB@midrange.com. | To unsubscribe from this list send email to MIDRANGE-L-UNSUB@midrange.com. | Questions should be directed to the list owner/operator: david@midrange.com +---
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.