|
What Al said. In addition , try from an as/400 command line - EDTRBDAP. Depending on your 400 configuration there may be logical files that did not get rebuilt - causing strange happenings in bpcs. If there are files that show *OPN, put a number in them (1-99) and get them rebuilt. If this screen shows up, ignore this posting: Type sequence, press Enter. Sequence: 1-99, *OPN, *HLD -----------Access Paths----------- Rebuild Elapsed Seq Status File Library Member Time Time (No access paths to display) Bottom F3=Exit F5=Refresh F11=Display member text F12=Cancel F13=Change multiple F15=Sort by F16=Repeat position to F17=Position to -----Original Message----- From: bpcs-l-bounces+ssegerstrom=intermatic.com@xxxxxxxxxxxx [mailto:bpcs-l-bounces+ssegerstrom=intermatic.com@xxxxxxxxxxxx] On Behalf Of Al Mac Sent: Monday, January 22, 2007 5:11 PM To: SSA's BPCS ERP System Subject: Re: [BPCS-L] Warehouse Allocations Have you done a successful backup, or did you get an error message that some file could not be backed up because of some problem with some index or data corruption? Have you done a reorganization of the allocations? Did it run Ok? It is always possible that people, in the middle of updating stuff when the outage occurred, were doing some task where their program left records out-of-sync. Even though the AS/400 probably has UPS in good condition, people at work stations, PCs etc. may have been abnormally terminated. Control files may be different for your version than us on 405 CD ... we have sometimes done a dump of data areas looking for settings out of whack. Problem is that when stuff goes haywire, the victims not always realize they need to notify IT that something needs fixing. We also have "list various files" all records where an IN USE flag is on. When everyone off system in evening, there should be no hits. We are version 6.04, a couple of weeks ago we had a power outage (this may or may not have anything to do with it), and every since then our warehouse allocations are not working for one of our warehouses. We have checked the warehouse maintenance which is flagged for allocations; we have checked the order maintenance records everything looks ok there; we have checked the facility planning records which everything looks ok; Item Master Maintenance looks ok; the pick release selection options in ord 550 look ok; and the warehouse location maintenance looks ok. When we put an order in for this particular warehouse the allocation does not come out on the pick list, nor does it show in the Inv 300 screen. Can anyone tell us what we missed or what could possibly be wrong? Thanks for your help Susan A. Wyatt Production Control Coordinator The Wittern Group 8040 University Des Moines, IA 50325 515-271-8412 Fax 515-274-5775 SWyatt@xxxxxxxxxxx Coming together is a beginning, Keeping together is progress, Working together is success -----Original Message----- From: bpcs-l-bounces+swyatt=wittern.com@xxxxxxxxxxxx [ mailto:bpcs-l-bounces+swyatt=wittern.com@xxxxxxxxxxxx] On Behalf Of bpcs-l-request@xxxxxxxxxxxx Sent: Friday, January 19, 2007 9:58 AM To: bpcs-l@xxxxxxxxxxxx Subject: BPCS-L Digest, Vol 5, Issue 17 Send BPCS-L mailing list submissions to bpcs-l@xxxxxxxxxxxx To subscribe or unsubscribe via the World Wide Web, visit http://lists.midrange.com/mailman/listinfo/bpcs-l or, via email, send a message with subject or body 'help' to bpcs-l-request@xxxxxxxxxxxx You can reach the person managing the list at bpcs-l-owner@xxxxxxxxxxxx When replying, please edit your Subject line so it is more specific than "Re: Contents of BPCS-L digest..." *** NOTE: When replying to this digest message, PLEASE remove all text unrelated to your reply and change the subject line so it is meaningful. Today's Topics: 1. Re: Delivery to 1 time customer / End-user (Arthur Shaffer) 2. Re: Delivery to 1 time customer / End-user (Peter Heeren) 3. Re: PO Actual Cost (daparnin@xxxxxxxxxxxxxx) 4. Re: PO Actual Cost (Dan Sweeney) 5. Re: PO Actual Cost (daparnin@xxxxxxxxxxxxxx) ---------------------------------------------------------------------- message: 1 date: Fri, 19 Jan 2007 04:13:32 -0800 (PST) from: Arthur Shaffer <abshaffer@xxxxxxxxx> subject: Re: [BPCS-L] Delivery to 1 time customer / End-user Peter, Who is paying for the parts? If it the end customer, I would think you would want the customer setup for A/R. If not, set up one customer "Spare Parts". Overide the address at order entry time to be the address for end customer where you are sending the parts. Art ----- Original Message ---- From: Peter Heeren <pheeren@xxxxxxxxxxx> To: bpcs-l@xxxxxxxxxxxx Sent: Friday, January 19, 2007 6:23:25 AM Subject: [BPCS-L] Delivery to 1 time customer / End-user Hello BPCS midrange group members, Our main customers are OEM and Wholesalers. We have setup the master records (customer master, Ship-to addresses, pricing, etc) for the order/shipping process. We are using BPCS 8.2 We are now facing a new challenge for our customer service department. They have to deliver spare parts to the end-user of our products. An end user can be compared with a one-time customer, for which we don't want to set up a customer master, ship to address etc... Has anyone of you solved this within the standard BPCS functionality? If not, what 'BPCS interfaced ' partner products are you using? Kind regards, Peter Heeren Please note: This e-mail is confidential and may also be privileged. Please notify us immediately if you are not the intended recipient. You should not copy it, forward it or use it for any purpose or disclose the contents to any person. For details of our international offices please visit our website: http://www.thetford.eu Thetford B.V. is statutorily based in Etten-Leur, Netherlands. Chamber of Commerce West-Brabant registration number 20037470. ___________________________________________________________________ This email has been scanned by the MessageLabs Email Security System. For more information please contact Thetford: +31 (0)76-504.23.49 ___________________________________________________________________ -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: abshaffer@xxxxxxxxx ------------------------------ message: 2 date: Fri, 19 Jan 2007 14:04:33 +0100 from: Peter Heeren <pheeren@xxxxxxxxxxx> subject: Re: [BPCS-L] Delivery to 1 time customer / End-user We are already 'mis-using' a standard customer as mentioned in your mail for free deliveries of service parts and override the address in order entry or create a ship to address. When the end user has to pay, we need to set up the ACR customer. ACR is owned by our accounting department, while order entry for these parts is done bij our customer service desk. In this case we need to involve 2 departments for s simple 1-time delivery. I was hoping there was a quicker work around. I was hoping there was an quicker work around. regards, Peter Arthur Shaffer <abshaffer@xxxxxxxxx> Sent by: bpcs-l-bounces+pheeren=thetford.nl@xxxxxxxxxxxx 19-01-2007 13:23 Please respond to SSA's BPCS ERP System <bpcs-l@xxxxxxxxxxxx> To "SSA's BPCS ERP System" <bpcs-l@xxxxxxxxxxxx> cc Subject Re: [BPCS-L] Delivery to 1 time customer / End-user Peter, Who is paying for the parts? If it the end customer, I would think you would want the customer setup for A/R. If not, set up one customer "Spare Parts". Overide the address at order entry time to be the address for end customer where you are sending the parts. Art ----- Original Message ---- From: Peter Heeren <pheeren@xxxxxxxxxxx> To: bpcs-l@xxxxxxxxxxxx Sent: Friday, January 19, 2007 6:23:25 AM Subject: [BPCS-L] Delivery to 1 time customer / End-user Hello BPCS midrange group members, Our main customers are OEM and Wholesalers. We have setup the master records (customer master, Ship-to addresses, pricing, etc) for the order/shipping process. We are using BPCS 8.2 We are now facing a new challenge for our customer service department. They have to deliver spare parts to the end-user of our products. An end user can be compared with a one-time customer, for which we don't want to set up a customer master, ship to address etc... Has anyone of you solved this within the standard BPCS functionality? If not, what 'BPCS interfaced ' partner products are you using? Kind regards, Peter Heeren Please note: This e-mail is confidential and may also be privileged. Please notify us immediately if you are not the intended recipient. You should not copy it, forward it or use it for any purpose or disclose the contents to any person. For details of our international offices please visit our website: http://www.thetford.eu Thetford B.V. is statutorily based in Etten-Leur, Netherlands. Chamber of Commerce West-Brabant registration number 20037470. ___________________________________________________________________ This email has been scanned by the MessageLabs Email Security System. For more information please contact Thetford: +31 (0)76-504.23.49 ___________________________________________________________________ -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: abshaffer@xxxxxxxxx -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: pheeren@xxxxxxxxxxx ___________________________________________________________________ This email has been scanned by the MessageLabs Email Security System. For more information please contact Thetford: +31 (0)76-504.23.49 ___________________________________________________________________ Please note: This e-mail is confidential and may also be privileged. Please notify us immediately if you are not the intended recipient. You should not copy it, forward it or use it for any purpose or disclose the contents to any person. For details of our international offices please visit our website: http://www.thetford.eu Thetford B.V. is statutorily based in Etten-Leur, Netherlands. Chamber of Commerce West-Brabant registration number 20037470. ___________________________________________________________________ This email has been scanned by the MessageLabs Email Security System. For more information please contact Thetford: +31 (0)76-504.23.49 ___________________________________________________________________ ------------------------------ message: 3 date: Fri, 19 Jan 2007 09:59:46 -0500 from: daparnin@xxxxxxxxxxxxxx subject: Re: [BPCS-L] PO Actual Cost Thanks guys. The term "expected cost" sounds familiar but if I have ever delt with it before it's been long enough that the storage in that part of my brain has already been reclaimed. :) Dan's answer brings up another question--what does PPV stand for? Still, my original question wasn't about the expected cost field, it was about the actual cost in PACST. Is that field the total cost from all receipts against that line, the cost of the last receipt against that line, or something else? To me it looks like the total but then we don't typically have multiple receipts against a single line but that's not to say that it never happens. Dave Parnin -- Nishikawa Standard Company Topeka, IN 46571 daparnin@xxxxxxxxxxxxxx "Dan Sweeney" <dsweeney@xxxxxxxxxxxxxxxx> Sent by: bpcs-l-bounces+daparnin=niscoseals.com@xxxxxxxxxxxx 01/18/2007 07:53 PM Please respond to SSA's BPCS ERP System To: "SSA's BPCS ERP System" <bpcs-l@xxxxxxxxxxxx>, "SSA's BPCS ERP System" <bpcs-l@xxxxxxxxxxxx> cc: Subject: Re: [BPCS-L] PO Actual Cost Your findings are truw: Withn the G/L the U transactions will post the std cost that is on the PO at the time the PO was entered and will affect the Inventory asset account and accrued liability. When the PO is costed by AP the C transaction posts the actual cost from the AP invoice and measures the PPV against the std cost on the PO vs. the actual cost on the AP invoice. The expected cost will default into the AP invoice. The actual cost from the AP invoice is a global cost and is not a facility cost. ________________________________ From: bpcs-l-bounces+dsweeney=phoenixbcinc.com@xxxxxxxxxxxx on behalf of macwheel99@xxxxxxxxxxx Sent: Thu 1/18/2007 5:46 PM To: SSA's BPCS ERP System Subject: Re: [BPCS-L] PO Actual Cost We recently had a similar confusion on 405 CD & it turns out that while the rest of BPCS has standard cost, actual cost, frozen cost, etc. the Purchase Order application has another cost not found any place else = EXPECTED COST. What happens is, when the PO is first created, the expected cost field is a copy of the standard cost, then after the vendor confirms our PO with the delivery date, pricing etc. our Purchasing people update the PO with that info. The new cost goes into the EXPECTED COST, which is what we expect the actual cost to be. This impacts a lot of purchasing reports and transactions. Right now we are trying to reconcile the General Ledger account where "U" transaction adds value when the inventory arrives in house, and the "C" transaction when ACP keys in the vendor invoice. In theory the only money in that account should be the value of raw materials that arrived, but not yet the invoices. Reality is a different story. Also, our SYS800 rules say that everything is to go into BPCS based on LAST STANDARD COST, but we have found out that some purchase order transactions go in as LAST ACTUAL COST. ---- Original message ---- >This is a question about a field in the HPO file. We are on version 4.02. > There is a field PACST (Actual Cost Total (global)). Is this the total >cost of the quantity received so far for that line? Ultimately, I'm want >the last invoiced piece price for a query but didn't know if the user >would be satisfied with an "average" price. That's what it looks like is >here but I wanted to confirm it. Thanks. > > >Dave Parnin >-- >Nishikawa Standard Company >Topeka, IN 46571 >daparnin@xxxxxxxxxxxxxx >-- >This is the SSA's BPCS ERP System (BPCS-L) mailing list >To post a message email: BPCS-L@xxxxxxxxxxxx >To subscribe, unsubscribe, or change list options, >visit: http://lists.midrange.com/mailman/listinfo/bpcs-l >or email: BPCS-L-request@xxxxxxxxxxxx >Before posting, please take a moment to review the archives >at http://archive.midrange.com/bpcs-l. > >Delivered-To: macwheel99@xxxxxxxxxxx -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: dsweeney@xxxxxxxxxxxxxxxx -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: daparnin@xxxxxxxxxxxxxx ------------------------------ message: 4 date: Fri, 19 Jan 2007 10:05:33 -0500 from: "Dan Sweeney" <dsweeney@xxxxxxxxxxxxxxxx> subject: Re: [BPCS-L] PO Actual Cost Dave, PPV = Purchase Price Variance ________________________________ From: bpcs-l-bounces+dsweeney=phoenixbcinc.com@xxxxxxxxxxxx on behalf of daparnin@xxxxxxxxxxxxxx Sent: Fri 1/19/2007 9:59 AM To: SSA's BPCS ERP System Subject: Re: [BPCS-L] PO Actual Cost Thanks guys. The term "expected cost" sounds familiar but if I have ever delt with it before it's been long enough that the storage in that part of my brain has already been reclaimed. :) Dan's answer brings up another question--what does PPV stand for? Still, my original question wasn't about the expected cost field, it was about the actual cost in PACST. Is that field the total cost from all receipts against that line, the cost of the last receipt against that line, or something else? To me it looks like the total but then we don't typically have multiple receipts against a single line but that's not to say that it never happens. Dave Parnin -- Nishikawa Standard Company Topeka, IN 46571 daparnin@xxxxxxxxxxxxxx "Dan Sweeney" <dsweeney@xxxxxxxxxxxxxxxx> Sent by: bpcs-l-bounces+daparnin=niscoseals.com@xxxxxxxxxxxx 01/18/2007 07:53 PM Please respond to SSA's BPCS ERP System To: "SSA's BPCS ERP System" <bpcs-l@xxxxxxxxxxxx>, "SSA's BPCS ERP System" <bpcs-l@xxxxxxxxxxxx> cc: Subject: Re: [BPCS-L] PO Actual Cost Your findings are truw: Withn the G/L the U transactions will post the std cost that is on the PO at the time the PO was entered and will affect the Inventory asset account and accrued liability. When the PO is costed by AP the C transaction posts the actual cost from the AP invoice and measures the PPV against the std cost on the PO vs. the actual cost on the AP invoice. The expected cost will default into the AP invoice. The actual cost from the AP invoice is a global cost and is not a facility cost. ________________________________ From: bpcs-l-bounces+dsweeney=phoenixbcinc.com@xxxxxxxxxxxx on behalf of macwheel99@xxxxxxxxxxx Sent: Thu 1/18/2007 5:46 PM To: SSA's BPCS ERP System Subject: Re: [BPCS-L] PO Actual Cost We recently had a similar confusion on 405 CD & it turns out that while the rest of BPCS has standard cost, actual cost, frozen cost, etc. the Purchase Order application has another cost not found any place else = EXPECTED COST. What happens is, when the PO is first created, the expected cost field is a copy of the standard cost, then after the vendor confirms our PO with the delivery date, pricing etc. our Purchasing people update the PO with that info. The new cost goes into the EXPECTED COST, which is what we expect the actual cost to be. This impacts a lot of purchasing reports and transactions. Right now we are trying to reconcile the General Ledger account where "U" transaction adds value when the inventory arrives in house, and the "C" transaction when ACP keys in the vendor invoice. In theory the only money in that account should be the value of raw materials that arrived, but not yet the invoices. Reality is a different story. Also, our SYS800 rules say that everything is to go into BPCS based on LAST STANDARD COST, but we have found out that some purchase order transactions go in as LAST ACTUAL COST. ---- Original message ---- >This is a question about a field in the HPO file. We are on version 4.02. > There is a field PACST (Actual Cost Total (global)). Is this the total >cost of the quantity received so far for that line? Ultimately, I'm want >the last invoiced piece price for a query but didn't know if the user >would be satisfied with an "average" price. That's what it looks like is >here but I wanted to confirm it. Thanks. > > >Dave Parnin >-- >Nishikawa Standard Company >Topeka, IN 46571 >daparnin@xxxxxxxxxxxxxx >-- >This is the SSA's BPCS ERP System (BPCS-L) mailing list >To post a message email: BPCS-L@xxxxxxxxxxxx >To subscribe, unsubscribe, or change list options, >visit: http://lists.midrange.com/mailman/listinfo/bpcs-l >or email: BPCS-L-request@xxxxxxxxxxxx >Before posting, please take a moment to review the archives >at http://archive.midrange.com/bpcs-l. > >Delivered-To: macwheel99@xxxxxxxxxxx -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: dsweeney@xxxxxxxxxxxxxxxx -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: daparnin@xxxxxxxxxxxxxx -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: dsweeney@xxxxxxxxxxxxxxxx ------------------------------ message: 5 date: Fri, 19 Jan 2007 10:57:33 -0500 from: daparnin@xxxxxxxxxxxxxx subject: Re: [BPCS-L] PO Actual Cost That makes sense. It's been a long week and my brain is only on half power today. "Dan Sweeney" <dsweeney@xxxxxxxxxxxxxxxx> Sent by: bpcs-l-bounces+daparnin=niscoseals.com@xxxxxxxxxxxx 01/19/2007 10:05 AM Please respond to SSA's BPCS ERP System To: "SSA's BPCS ERP System" <bpcs-l@xxxxxxxxxxxx>, "SSA's BPCS ERP System" <bpcs-l@xxxxxxxxxxxx> cc: Subject: Re: [BPCS-L] PO Actual Cost Dave, PPV = Purchase Price Variance ________________________________ From: bpcs-l-bounces+dsweeney=phoenixbcinc.com@xxxxxxxxxxxx on behalf of daparnin@xxxxxxxxxxxxxx Sent: Fri 1/19/2007 9:59 AM To: SSA's BPCS ERP System Subject: Re: [BPCS-L] PO Actual Cost Thanks guys. The term "expected cost" sounds familiar but if I have ever delt with it before it's been long enough that the storage in that part of my brain has already been reclaimed. :) Dan's answer brings up another question--what does PPV stand for? Still, my original question wasn't about the expected cost field, it was about the actual cost in PACST. Is that field the total cost from all receipts against that line, the cost of the last receipt against that line, or something else? To me it looks like the total but then we don't typically have multiple receipts against a single line but that's not to say that it never happens. Dave Parnin -- Nishikawa Standard Company Topeka, IN 46571 daparnin@xxxxxxxxxxxxxx "Dan Sweeney" <dsweeney@xxxxxxxxxxxxxxxx> Sent by: bpcs-l-bounces+daparnin=niscoseals.com@xxxxxxxxxxxx 01/18/2007 07:53 PM Please respond to SSA's BPCS ERP System To: "SSA's BPCS ERP System" <bpcs-l@xxxxxxxxxxxx>, "SSA's BPCS ERP System" <bpcs-l@xxxxxxxxxxxx> cc: Subject: Re: [BPCS-L] PO Actual Cost Your findings are truw: Withn the G/L the U transactions will post the std cost that is on the PO at the time the PO was entered and will affect the Inventory asset account and accrued liability. When the PO is costed by AP the C transaction posts the actual cost from the AP invoice and measures the PPV against the std cost on the PO vs. the actual cost on the AP invoice. The expected cost will default into the AP invoice. The actual cost from the AP invoice is a global cost and is not a facility cost. ________________________________ From: bpcs-l-bounces+dsweeney=phoenixbcinc.com@xxxxxxxxxxxx on behalf of macwheel99@xxxxxxxxxxx Sent: Thu 1/18/2007 5:46 PM To: SSA's BPCS ERP System Subject: Re: [BPCS-L] PO Actual Cost We recently had a similar confusion on 405 CD & it turns out that while the rest of BPCS has standard cost, actual cost, frozen cost, etc. the Purchase Order application has another cost not found any place else = EXPECTED COST. What happens is, when the PO is first created, the expected cost field is a copy of the standard cost, then after the vendor confirms our PO with the delivery date, pricing etc. our Purchasing people update the PO with that info. The new cost goes into the EXPECTED COST, which is what we expect the actual cost to be. This impacts a lot of purchasing reports and transactions. Right now we are trying to reconcile the General Ledger account where "U" transaction adds value when the inventory arrives in house, and the "C" transaction when ACP keys in the vendor invoice. In theory the only money in that account should be the value of raw materials that arrived, but not yet the invoices. Reality is a different story. Also, our SYS800 rules say that everything is to go into BPCS based on LAST STANDARD COST, but we have found out that some purchase order transactions go in as LAST ACTUAL COST. ---- Original message ---- >This is a question about a field in the HPO file. We are on version 4.02. > There is a field PACST (Actual Cost Total (global)). Is this the total >cost of the quantity received so far for that line? Ultimately, I'm want >the last invoiced piece price for a query but didn't know if the user >would be satisfied with an "average" price. That's what it looks like is >here but I wanted to confirm it. Thanks. > > >Dave Parnin >-- >Nishikawa Standard Company >Topeka, IN 46571 >daparnin@xxxxxxxxxxxxxx >-- >This is the SSA's BPCS ERP System (BPCS-L) mailing list >To post a message email: BPCS-L@xxxxxxxxxxxx >To subscribe, unsubscribe, or change list options, >visit: http://lists.midrange.com/mailman/listinfo/bpcs-l >or email: BPCS-L-request@xxxxxxxxxxxx >Before posting, please take a moment to review the archives >at http://archive.midrange.com/bpcs-l. > >Delivered-To: macwheel99@xxxxxxxxxxx -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: dsweeney@xxxxxxxxxxxxxxxx -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: daparnin@xxxxxxxxxxxxxx -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: dsweeney@xxxxxxxxxxxxxxxx -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: daparnin@xxxxxxxxxxxxxx ------------------------------ -- This is the SSA's BPCS ERP System (BPCS-L) digest list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. End of BPCS-L Digest, Vol 5, Issue 17 ************************************* ______________________________________________________________________ This e-mail has been scanned by Managed Email Content Service, using Skeptic(tm) technology powered by MessageLabs. ______________________________________________________________________ -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: macwheel99@xxxxxxxxxxx - Al Macintyre http://en.wikipedia.org/wiki/User:AlMac http://www.ryze.com/go/Al9Mac BPCS/400 Computer Janitor ... see http://radio.weblogs.com/0107846/stories/2002/11/08/bpcsDocSources.html -- This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. Delivered-To: SSegerstrom@xxxxxxxxxxxxxx
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.