IBM has this figured out also. There's something under the covers, I
BELIEVE (ymmv), that will catch this. I strongly suggest you do a full
system save under V4R5 in case you want to be able to use this machine and
your technique doesn't work.
Did you have software subscription on the 820? If so you should have been
able to upgrade to V5R2 then V5R3 without any IBM cost.
Rob Berendt
--
Group Dekko Services, LLC
Dept 01.073
PO Box 2000
Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
"MITTELHEISSER Jean Claude" <mitteljc@xxxxxxx>
Sent by: midrange-l-bounces@xxxxxxxxxxxx
10/25/2004 07:15 AM
Please respond to
Midrange Systems Technical Discussion <midrange-l@xxxxxxxxxxxx>
To
"Midrange Systems Technical Discussion" <midrange-l@xxxxxxxxxxxx>
cc
Fax to
Subject
RE: Version change
Thanks. I've heard about these 70 days. So each time I start my back-up
system with the tapes saved on my V5R3 production system, I will have 70
days to work with. That could help.
Regards.
Jean-Claude
-----Message d'origine-----
De : midrange-l-bounces@xxxxxxxxxxxx
[mailto:midrange-l-bounces@xxxxxxxxxxxx]De la part de Eduard van den
Braken
Envoyé : lundi 25 octobre 2004 10:23
À : Midrange Systems Technical Discussion
Objet : RE: Version change
Jean Claude
You will need new keys.
Keys are Serialnumber, processortype bound!
Upgrading from V4R5 directly to V5R3 is not possible, you are only allowed
to skip 1 release
V4R5 to V5R2 and then to V5R3
You don't need keys for V5R2 because you have 70 days tot get the keys and
before that time you will upgrade to V5R3 for which you will also have 70
days to get the keys, without the keys is will stop working after 70 days.
Met vriendelijke groet, / best regards
Eduard van den Braken
Technisch Consultant AS WebSphere C&I - iSeries
Inter Access B.V.
E-mail: eduard.van.den.braken@xxxxxxxxxxxxxx
Tel: 035 - 68 88 400
Fax: 035 - 68 88 444
Marathon 5, 1213 PC Hilversum
Postbus 840, 1200 AV Hilversum
Bezoek onze website: www.interaccess.nl
________________________________
Van: midrange-l-bounces@xxxxxxxxxxxx namens MITTELHEISSER Jean Claude
Verzonden: ma 25-10-2004 9:36
Aan: Midrange Systems Technical Discussion
Onderwerp: Version change
Hi all,
I would like to upgrade the version of my 820 from V4R5 to V5R3 to use it
as back-up of a 520 and to test some softs. IBM told us it will cost near
to 60000 euros, that means more than to buy a new 520. OK, 820 is a P20
machine and 520 is a P10 one. We didn't even ask what it will cost to
upgrade our 830 which is a P30 machine. It's like IBM wants us to change
all our material...
I have never done a system upgrade. Is it true that we need a special key
to upgrade ? Does it mean software key is related to the machine id and to
the version ? No matter if I have no maintenance on it. Isn't it possible
to use the V4R5 key when loading a V5R3 from CD's ?
Thanks.
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing
list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing
list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing
list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.