|
Ramanujam, I'm confused. describe what you mean by a control break within a control break, and tell me how using L2 for the 1st, and L1 for the break within the break wouldn't work? Rick ---original message--- Ramanujam said: Thanks for the reply Doug. I have had just 1 program that required more than 10 levels. Actually, one of the reports that I was working on has to have a control break within a control break. I wanted to use the cycle logic for this one but I guess I cannot. I used SQL Unions to get both detail and summary lines in the same result set and the stuff came out pretty good. Thanks for the help though.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.