Save to the IBM i box that's attached. You'll be able to get to it if you
need with a USB.
I do it all the time, in fact I have jobs set up in the scheduler to run the
backups on a periodic basis.
--
Jim Oberholtzer
Agile Technology Architects
-----Original Message-----
From: MIDRANGE-L [mailto:midrange-l-bounces@xxxxxxxxxxxx] On Behalf Of Rob
Berendt
Sent: Thursday, May 17, 2018 11:58 AM
To: midrange-l@xxxxxxxxxxxx
Subject: Dual HMC's: Upgrade issue
Ok, I have two HMC's. One is local and one is at the remote DC.
The local one has the consoles for the two local Power 8's but can also
manage the remote system at the DC.
The remote one has the consoles for the Power 8 at the DC but can also
manage the two local systems here.
They are both running
Version: 8
Release: 8.6.0
Service pack: 2
I want to upgrade them to 9.
On the local HMC I went to save the upgrade data to the USB and had to go
stick it in.
Then it dawned on me, did I leave the stick in the remote one? Tried.
Nope.
So, in my scenario, should I upgrade the local one or wait until I can run
to the remote DC and stick the USB in that one?
I wonder what the DC charges to stick in a USB stick and will they get it
into the right machine?
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1 Group Dekko Dept 1600 Mail
to: 2505 Dekko Drive
Garrett, IN 46738
Ship to: Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx To subscribe, unsubscribe,
or change list options,
visit:
https://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx Before posting, please take a
moment to review the archives at
https://archive.midrange.com/midrange-l.
Please contact support@xxxxxxxxxxxx for any subscription related questions.
Help support midrange.com by shopping at amazon.com with our affiliate link:
http://amzn.to/2dEadiD
As an Amazon Associate we earn from qualifying purchases.