Rob,
Working fine on my V7R3 LPAR.
IBM CE called within 10 minutes, confirming they got the test service request.
VFYSRVCFG SERVICE(*ECS) VFYOPT(*ALL)
Verify processing started.
Verification for Edge_Gateway_1 was successful.
Verification for Edge_Gateway_2 was successful.
Verification for Edge_Gateway_3 was successful.
Verification for Edge_Gateway_4 was successful.
Verification for Edge_Gateway_5 was successful.
Verification for Edge_Gateway_6 was successful.
Verification for Edge_Gateway_10 was successful.
Verification for Edge_Gateway_11 was successful.
Verification for Edge_Gateway_12 was successful.
Verification for Edge_Gateway_7 was successful.
Verification for Edge_Gateway_8 was successful.
Verification for Edge_Gateway_9 was successful.
Verification for Edge_Problem_Report_1 was successful.
Verification for Edge_Problem_Report_2 was successful.
Verification for Edge_Problem_Report_3 was successful.
Verification for Edge_Problem_Report_4 was successful.
Verification for Edge_Problem_Report_5 was successful.
Verification for Edge_Problem_Report_6 was successful.
Verification for QVPN01IBM1 was successful.
Verification for QVPN01IBM2 was successful.
Verify processing completed.
SNDSRVRQS ACTION(*TEST)
Object QESE099232 type *DTAQ created in library QGPL.
Test request complete.
Object QESE099232 in QGPL type *DTAQ deleted.
Paul
-----Original Message-----
From: MIDRANGE-L [mailto:midrange-l-bounces@xxxxxxxxxxxx] On Behalf Of Rob Berendt
Sent: Tuesday, January 09, 2018 7:53 AM
To: Midrange Systems Technical Discussion
Subject: RE: Service agent failing verification after upgrading to V7R3
Still a whacked out mess.
After running
VFYSRVCFG SERVICE(*ECS) VFYOPT(*ALL)
I run
SNDSRVRQS ACTION(*TEST)
Point-to-point profile QVPN01IBM1 in use.
Job locked MUTEX +QTOCPTP/SPACE+ previously (tocSyncObj:274).
Error occurred while processing request.
Even after I sign off/on again.
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1 Group Dekko Dept 1600 Mail to: 2505 Dekko Drive
Garrett, IN 46738
Ship to: Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
From: "Steinmetz, Paul" <PSteinmetz@xxxxxxxxxx>
To: "'Midrange Systems Technical Discussion'"
<midrange-l@xxxxxxxxxxxx>
Date: 01/08/2018 04:40 PM
Subject: RE: Service agent failing verification after upgrading to
V7R3
Sent by: "MIDRANGE-L" <midrange-l-bounces@xxxxxxxxxxxx>
Rob,
I opened a PMR with IBM.
Service Agent fixed for V7R3.
VFYSRVCFG working.
Here is the link to the document that discusses the change made to ESA to
use the EDGE server at 7.3:
http://www-01.ibm.com/support/docview.wss?uid=nas8N1018980
I needed to clear '/QIBM/UserData/OS400/UniversalConnection/*' (prior
V7R3 info residing)
Apply below PTFs. (not all published, nor part of CUM and/or group.
Recommended PTFs
SI66506
SI62445
SI62179
SI66174
SI61128
SI64488
SF99725 730 Java - level 6
Then delete and re-create the service agent.
DLTSRVCFG DLTCMNCFG(*YES)
CRTSRVCFG ROLE(*PRIMARY) CNNTYPE(*DIRECT) CNTRYID(*SELECT) STATE(*SELECT)
VFYSRVCFG SERVICE(*ECS) VFYOPT(*ALL)
Paul
-----Original Message-----
From: MIDRANGE-L [mailto:midrange-l-bounces@xxxxxxxxxxxx] On Behalf Of Rob
Berendt
Sent: Monday, January 08, 2018 9:26 AM
To: Midrange Systems Technical Discussion
Subject: Re: Service agent failing verification after upgrading to V7R3
Since V7R3 I no longer use VFYSRVCFG. It actually was corrupting service
config. If you care to fight that battle, good luck.
I will forware you offlist an attachment which covers my quarterly testing
of service.
Rob Berendt
As an Amazon Associate we earn from qualifying purchases.