|
>From my COMMON pitch, "Everything You Always Wanted to Know About System Values (but were afraid to ask), which you will *NEVER hear at an IBM Technical Conference: ***** START ***** Name: QIPLSTS Description: IPL Status Indicator Length & Type: Character: 1 Valid Values and their Meanings: '0' Operator Panel IPL IPL occurred when requested from operator panel. '1' Auto-IPL - following power failure This is enabled by the QPWRRSTIPL system value. '2' Restart IPL After PWRDWNSYS RESTART(*YES) '3' Time-of-day IPL IPL occurred automatically at the date and time specified by the QIPLDATTIM system value. '4' Remote IPL IPL occurred in response to a phone call. This is enabled by the QRMTIPL system value. Comments: OS/400 sets this value on each IPL. Can not be changed by user written routine. (Embedded image moved to file: pic06772.jpg) ****** END ****** Al Barsa, Jr. Barsa Consulting Group, LLC 400>390 "i" comes before "p", "x" and "z" e gads Our system's had more names than Elizabeth Taylor! 914-251-1234 914-251-9406 fax http://www.barsaconsulting.com http://www.taatool.com p://www.as400connection.com rob@xxxxxxxxx Sent by: midrange-l-bounce To s@xxxxxxxxxxxx Midrange Systems Technical Discussion <midrange-l@xxxxxxxxxxxx> 11/18/2004 10:52 cc AM Subject Re: Question on IPL "types" Please respond to Midrange Systems Technical Discussion <midrange-l@midra nge.com> GO POWER? Rob Berendt -- Group Dekko Services, LLC Dept 01.073 PO Box 2000 Dock 108 6928N 400E Kendallville, IN 46755 http://www.dekko.com "Chuck Lewis" <clewis@xxxxxxxxxx> Sent by: midrange-l-bounces@xxxxxxxxxxxx 11/18/2004 08:47 AM Please respond to Midrange Systems Technical Discussion <midrange-l@xxxxxxxxxxxx> To "'Midrange Systems Technical Discussion'" <midrange-l@xxxxxxxxxxxx> cc Fax to Subject Question on IPL "types" Hi Folks, Had a friend at a company that has acquired another company and he is now responsible for keeping an eye on this additional AS/400 located a LONG way from here. He noticed that the system value QABNORMSW was set to 1(abnormal) indicating that the last IPL was abnormal and told them that they might start thinking of a time that when they could do a normal IPL.. He got this back from them: I have scheduled an ipl of the system for Sunday PM Nov 21 at 23:55 pm (SbmIplGrp2). I am using a special program I wrote that ipl's the system without turning off all the disks arrays due to the worry of having additional sticky fans in the third tower. I missed scheduling the job in Oct. Thanks. And was asking me what kind of program they could have written that did this. The only thing I could think of is they are doing a Powerdown with Restart(*YES) and everything "under the covers" stays active ? Oh, and there is no maintenance on this machine to get the fans replaced. Unreal. Thanks ! Chuck -- This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list To post a message email: MIDRANGE-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/midrange-l or email: MIDRANGE-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/midrange-l. -- This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list To post a message email: MIDRANGE-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/midrange-l or email: MIDRANGE-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/midrange-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.