|
Last night, after nightly backups, and at the direction of my APC support tech, I initiated a front-panel self-test of the balky UPS.
Wow! The alarm started going off, and as soon as I looked at the AS/400's LCD, it was going through D-series shutdown SRCs. Even after I'd let go of the on/test button, it was shutting itself down in a big hurry (when the combination of on-battery and low-battery signals initiates a LIC disaster shutdown, it's fast and unstoppable). Within 2 minutes, the machine was shut down. It took over half an hour to come back up (most of it spent checking the synchronization on the 100% mirrored hard drives). Glad I waited until after hours, even if it did mean babysitting a painfully slow IPL.
Any ideas, short of inserting a short adapter (I'm thinking, 2-3" of ribbon cable, w/male and female DB9s) with the "low battery" line physically severed?
-- JHHL
_______________________________________________ This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list To post a message email: MIDRANGE-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/midrange-l or email: MIDRANGE-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/midrange-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2025 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.