|
Status 10 MO's are MO's that contain no activity BUT are assigned a cost at time of order release. Changing the operation code to "C" on the order will facilitate proper routing but, I do not believe, would have any impact on the anticipated cost of the order. Status 40 MO's are MO's that have had some (material and/or labor) activity. Once an MO has activity posted against it, you can't change the anticipated cost of the order. Changing an operation time basis code to "C" AFTER activity has been posted will never change the anticipated cost, thus MAPICS will ignore it. Status 45 MO's are MO's that have had material "completed". This means that some one has ensured that all material issues, scrap and receipts to stock (including returns to stock) have been recorded correctly. Again, changing a time basis code on an order at this stage will not change the anticipated cost AND since the order is "completed" changing the time basis code at this point will have no effective impact on operations. Thus changing a time basis code with DFU has no impact. If an order is status 40 and the desire is to facilitate ease of operations (purchasing, shop floor, accounts payable, etc.)the best course of action would be to add a new operation to the order with the correct time basis code immediately following the incorrect operation. Change the status of the incorrect operation to inactive or "completed" if some labor has been reported against it. If this is a constant problem in your environment, it would be advisable to review routings for manufactured items prior to MO release. Also, change your engineering procedures to ensure the correct code. Kevin Fox kdfox@xxxxxxxxxxxxx -----Original Message----- From: aldg3@xxxxxxxxxxx [mailto:aldg3@xxxxxxxxxxx] Sent: Tuesday, July 06, 2004 3:45 PM To: Mapics ML Cc: Gershen, Al Subject: Changing MO Routing Status Codes Environment: Mapics DB (Mod 4) with PCC, PDM, etc. Hi group: I wrote a query looking at all current MO's in PC&C that had Routing Operations that were Outside Operations and that lacked the Time Base Code set at "C" (that is, the code was set at "blank"). The query produced a report listing MO's that were at Status 10, 40 and 45. The routing statuses were either 10 or 30 (all of the stat 45 MO's had their routing status set at 30). I was able to put the C code into all routings that were at status 10 using Mapics PC&C File Maintenance MO Operations Detail but that program would not allow me to put the code into the stat 45 Mo's whose routings that were at status 30. I even changed their MO status from 45 to 40 and I was still unable to add the routing C code. What is the logic at play here? Is there another way to accomplish this using Mapics DB? If I were to change the Time Base Code to C using DBU, would Mapics accept the code and put Outside Processing charges where they belong? I look forward to your comments. Regards, Al Gershen Cost Accounting Tech ECS Composites Was: aldg3@xxxxxxxxxxx Now: aldg3@xxxxxxxxx Regards, Al Gershen Cost Accountant Lead ECS Composites Grants Pass, OR, USA aldg3@xxxxxxxxxxx
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.