×
The internal search function is temporarily non-functional. The current search engine is no longer viable and we are researching alternatives.
As a stop gap measure, we are using Google's custom search engine service.
If you know of an easy to use, open source, search engine ... please contact support@midrange.com.
Feedback I hoping to see here is
* perhaps there is some coding we should check to make sure that some
items are setup right
* perhaps there is a known BPCS bug and a known work around
* perhaps BPCS does not support what we are trying to do, and there are
suggested solutions
We are on 405 CD modified ... we are using small portions of DRP and JIT
and have modified them. I told my boss that for this scenario, I thought
we should consult with our tech support, but he is reluctant to call tech
support every time something goes wrong ... he wants us first to check what
we can check in case we do in fact have some incorrect coding or
inappropriate transactions, that we ourselves can identify.
Historically our items fell into several categories
* manufactured
* purchased
* neither ... such as engineering change history comment in BOM and
item#s used for purposes other than items
Recently we have some items that are BOTH manufactured and purchased, and
it is with them that we are having a problem.
Without me going into the business particulars, there are some parts that
we can manufacture on extremely short notice (like a few days) or we can
source more cheaply in which there is a long lead time (many weeks), so
customers have choice of getting their parts in a few days after order, at
a higher price, or waiting several weeks and getting them at lower price.
A related topic is making the two different prices easily accessible to
customer service, for when they keying in the orders. I suggested having a
different customer # for the same customer name address, one for facility
60 and the original for the manufacturing facilities, then place the
facility 60 price in the special price file which has differentiation by
item and customer, but not by facility.
We use one facility for each of our factories, 20 40 etc.
In manufacturing facilities, the cost buckets of items include material,
overhead, human labor, machine, outside operations
Historically we consider cost variances in purchased materials to be a
problem area, but expect variations in the actual cost of manufacturing.
We are using facility 60 for the distribution of the parts we buy on behalf
of customers.
Parts in this facility are setup using material cost ONLY
There should be almost no cost variance because we contract for pricing,
receive the parts, receive vendor invoice, do the 3 way match.
There are not supposed to be any BOM or routings in facility 60.
Things get setup so they are correct, then later we discover that various
items in facility 60 have had added to them a copy of the cost buckets that
facility 20 or some other manufacturing facility has, with the same actual
costs as that other facility, while standard zero for those non-material
buckets. This in turn causes a cost variance ... we have not figured out
what damage downstream like to G_L, but basically this is something we not
want happening and need to figure out what causes it ... I found out for
the first time about this near the end of last week ... some co-workers
have known about it longer than me.
I ran a query/400 listing buckets of facility 60 other than material and
total, which had got populated with non-zero, then for those items I
checked what recent transaction there had been in any facility, since the
last time the costs had been believed to be correct.
* They had been manufactured and shipped in facilities 20 40
* They had been received and shipped in facility 60
* They had been transferred both ways in and out of facility 60 vs. the
other facilities.
One co-worker speculates that what is happening is there is a bug in the
labor reporting such that when labor updates these items in facility 20 or
another manufacturing facility, it also updates those actual costs in all
facilities ... I find this hard to believe since the different
manufacturing facilities have never contaminated each other in the past.
My speculation is that when the item gets transferred between facilities,
for whatever purpose such as doing a consolidated shipment, for
consolidated inspection before shipment, or by mistake, the method of
transfer causes the TO facility cost buckets to get populated based on
which buckets existed in the FROM facility that did not pre-exist in the TO
facility.
Currently our cost basis is LAST COST, not any averaging, and our
Accounting is at Standard Cost, with some monthly adjustments to compensate
for what is in Production Work in Process.
I suggested that perhaps we need an Al fixit program to be run regularly to
unpopulate facility 60 of the unwanted cost buckets. Al's boss says no, we
first figure out what is causing facility 60 to get the unwanted stuff,
perhaps we doing something wrong and it is better to not be doing that.
I plan to do some experiments in which I pick a weekend time when no one
else updating BPCS, find one of these items that has on-hand in both
facility 20 and 60, is manufactured in 20 and purchased in 60, make sure
the costs are correct, then do one of the actions that is suspected of
contaminating facility 60 costs, then check the costs again. I have
several different things I want to try.
But right at the moment I am covered up in more urgent work I need to do,
and next weekend is EOM, so it will probably be a couple weeks until I do
my round of tests, by which time I may have added to the list of things I
plan to check.
This weekend I spent a large chunk of time with cost repairs.
We had over 1,000 items in which the actual cost buckets did not add up
right, a handful of items with negative costs, and other problems.
The reasons for this are problems previously discussed in BPCS_L and stuff
I had not looked at for some time, but now were contributing to some
reports not being correct.
PS ... thanks for the XL/400 tips
-
Al Macintyre http://www.ryze.com/go/Al9Mac
Find BPCS Documentation Suppliers
http://radio.weblogs.com/0107846/stories/2002/11/08/bpcsDocSources.html
BPCS/400 Computer Janitor
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact
[javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.