I tell you something that makes a BIG difference for our EOM.
I go to the main console and stop all sub systems (except QCTL)
then I start QBATCH and main printer and nothing else
then I run the EOM tasks from the main console that cannot abide other users signing on in the middle of, like INV900 for example
I do a backup at the beginning and end of EOM stuff, after which all subsystems get restarted
I have got our 400 on dynamic load balancing so that it assigns memory etc. where needed


certain kinds of conflicts and hassles have vanished
It used to be ... it did not matter how many times you told how many people
During End Month, we cannot have ANYONE signing onto the 400 for ANY reason, other than the people doing end month ... we expect to get done Sunday 5 am and will let you know for sure
I guarantee you, 1/2 the end fiscals would get messed up by someone signing on during the prohibited time frame and 1/2 the rest would get messed up by someone on the end fiscal staff getting in conflict with themselves.


once INV900 is going, I sign off quick as a bunny, so I not conflict with myself.
Our check list has on it how long certain stuff tends to run based on past experience, so I know after 2-3 hours to start checking every 20 minutes or so, using test environment or some IBM Q sign on, to check on "Is it done yet?"
I am tempted to modify it to send message to these alternative sign ons when in fact it is done.


We are on 405 CD

Clare wrote:
Steve,

Have you thought about using the BPCS Archiving? This would remove a lot of the older records to a separate BPCS environment where your users could still look at them if necessary, and month-end (and daily transaction processing) would run a whole lot quicker too.
You could also investigate creating appropriate indexes for month-end. That usually gives about a 40% improvement at least.
And finally, are you running month-end in the batch pool or where? SQL runs differently based on how much memory is available in the pool it runs in. Does closing all the other subsystems and running it in *Base make any difference??
Some of the files that get really huge and need archiving are things like CMF (Cost Master) and ZPD (printing), and these are accessed many times (multiplier is number of records in primary files) during such processing.


Hope this helps,

Clare

Clare Holtham
Director, Small Blue Ltd - Archiving for BPCS
Web: www.smallblue.co.uk
IBM Certified AS/400 Systems Professional
E-Mail: Clare.Holtham@xxxxxxxxxxxxxx
Mobile: +44 (0)7960 665958
  ----- Original Message -----
  From: Steve Segerstrom
  To: bpcs-l@xxxxxxxxxxxx
  Cc: Russell Koenig ; Gerard Tilton
  Sent: Wednesday, June 23, 2004 11:38 PM
  Subject: Month end jobs - CEA and Inventory close


We are bpcs 6.02 heavily modified.
I am toying with the idea of running CEA concurrently with the month end inventory jobs. By cea I mean that we are running batch posting (CLDI501 BTP posting) for cost of goods sold, daily postings. It takes about 2.5 hours to get through all of the posting jobs at which time I run my inventory close and then all of the inventory reports. Takes another 6+ hours.
So - I am going to copy the files I need for the inventory reports - they are all read only and go ahead and bring up bpcs. I could come up another 2 hours earlier if I could run my inventory close and then bring up bpcs while cea runs in the background. I am having a tough time believing that posting transactions to the GL would have an impact on ITH ILI IWI files and that they would pick up additional activity after bpcs is brought up. Am I being stupid, playing with fire, or onto something?
> -----Original Message-----
> From: owner-bpcs-l@xxxxxxxxxxxx [<mailto:owner-bpcs-l@xxxxxxxxxxxx]On>
> Behalf Of Certz
> Sent: Thursday, April 29, 1999 10:26 PM
> To: BPCS-L@xxxxxxxxxxxx
> Subject: RE: Month-End Close
>
>
> Period End Close Programs for 6.0.02(mm):
>
> FOR900 Purge and Roll History
> FOR910 Update Current Demand
> FOR915 Update Current Orders
> FOR920 Update Current Forecast
> FOR930 Load Item / Warehouse from Basis
> JIT900 Production History Purge
> DRP500 Distribution Requirements Planning
> MRP500 Master Production Schedule Generation
> MRP600 Material Requirements Planning Generation
> CAP600 Capacity Requirements Generation
> CAP160 Reload Bill of Resources
> CAP500 Rough Cut Capacity Planning
> CAP900 Capacity Weekend
> CST120 Overhead Cost Input
> CST510 Overhead Allocation
> CST910 Labor Ticket Post
> SFC900 Shop Order Close (if Costing NOT installed)
> CST900 Shop Costing Post / Close
> PRF900 Period end Close
> SFC905 Labor Ticket Save
> PUR900 Purchasing Period-End
> ACP900 Accounts Payable Period-End
> ACR900 A/R Period End Close
> INV920 Inventory Transaction Subsystem Post
> INV900 Inventory Period-End
> INV972 Reset On Hand Balances
> INV973 Delete Warehouse (IWI Records With No Inventory
> SFC990 File Reset & Clean Up
> ORD990 File Reset & Clean Up
> SYS990 Clear/Reset Lot/Location Allocations
> INV971 Reset On Order and Allocated Amounts
> CEAGTB CEA Period Close
>
> Year End Close Programs
>
> FOR940 List Seasonality History Factors
> FOR950 Update Seasonality History Factors
> JIT900 Production History Purge
> CAP910 Capacity Year End
> ACR910 A/R Year End (if INV is NOT installed)
> INV910 Inventory Year End
> INV660 Clear Physical Inventory
> INV620 Print Inventory Tags
> PUR910 Purchasing Year End
> ACP920 1099 Report
> ACP910 A/P Year End
> FXA900 Fixed Assets Year-End Processing
> FXA910 Mid-Quarter Convention (If mandated by FXA900)
> FXA920 Year-End Roll and Close - Fixed Assets
> CEAGDS CEA Transfer Opening Balances
> PRF900 Period End Close
>
> The above are all of the BPCS close programs for the release I am on.
> I do not run all of the above. I only run the packages I
> have installed.
> I hope this will be of some help.
>
> The above order is the BPCS run order supplied by the Helpline.
>
> Sincerely,
>
> Chris Ertz
> Software Development Manager
> American Metal Products
>



Steve Intermatic Inc (815) 675-7469


_______________________________________________ This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l. _______________________________________________ This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l.



As an Amazon Associate we earn from qualifying purchases.

This thread ...

Replies:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.