You can control that in the backup policy (which is what the entry you
point out is doing) or stop it altogether with *NONE in that field at
the control group. (option 8, scroll down 1 page) You can stop is
globally (bad idea for recovery) by changing the back up policy.
To add what it does in the control group, use SAVMEDIBRM to back up
QUSRBRM and the balance of the recovery information at the end of the
tape.
I highly suggest you manage that at the control group level rather than
change the defaults.
Jim Oberholtzer
Chief Technical Architect
Agile Technology Architects
On 2/12/2013 10:51 AM, rob@xxxxxxxxx wrote:
How do I turn this off:
Automatically backup
media information . . . . . . . . . *BKUPCY
And add what it does as a step in that control group?
This way I can still keep the ftp as a step in the control group - just
following this new step. Otherwise I have to look at things like Advanced
Job Scheduler to ensure that this job is done before starting the ftp. Or
if I do stuff like a separate job in the regular job scheduler I have to
worry about when the first job takes longer, or if someone holds or
changes the start time in the first job, etc.
Rob Berendt
-- IBM Certified System Administrator - IBM i 6.1 Group Dekko Dept
1600 Mail to: 2505 Dekko Drive Garrett, IN 46738 Ship to: Dock 108
6928N 400E Kendallville, IN 46755 http://www.dekko.com
--