Might want to check your effectivity in the BOM.

Mona

-----Original Message-----
From: system21-request@xxxxxxxxxxxx
[mailto:system21-request@xxxxxxxxxxxx]
Sent: Friday, February 20, 2004 12:12 AM
To: system21@xxxxxxxxxxxx
Subject: SYSTEM21 Digest, Vol 2, Issue 44


Send SYSTEM21 mailing list submissions to
        system21@xxxxxxxxxxxx

To subscribe or unsubscribe via the World Wide Web, visit
        http://lists.midrange.com/mailman/listinfo/system21
or, via email, send a message with subject or body 'help' to
        system21-request@xxxxxxxxxxxx

You can reach the person managing the list at
        system21-owner@xxxxxxxxxxxx

When replying, please edit your Subject line so it is more specific
than "Re: Contents of SYSTEM21 digest..."


Today's Topics:

   1. different UOM in different stockrooms for same item
      (Sanne Stewart)
   2. RE: different UOM in different stockrooms for same i tem
      (Johnson, Duane)
   3. Planning stops in MRP/MPS (Johnson, Duane)
   4. RE: Planning stops in MRP/MPS (Roy Cox)
   5. Ship time (Kincer, Alan)
   6. RE: Ship time (Lin Walsh)
   7. RE: Ship time (Kincer, Alan)
   8. RE: Planning stops in MRP/MPS (Johnson, Duane)
   9. RE: Planning stops in MRP/MPS (Grinstead, Scott)
  10. RE: [SYSTEM21] Planning stops in MRP/MPS (Jeff Klipa)


----------------------------------------------------------------------

message: 1
date: Thu, 19 Feb 2004 12:24:42 +1100
from: "Sanne Stewart" <Sanne.Stewart@xxxxxxxxxxxxxxxxx>
subject: [SYSTEM21]   different UOM in different stockrooms for same
        item

Item exists in 2 different stockrooms and has been set-up with different
issue units (kg & ct) in the different stockrooms. This is visible in
the different item/stockroom enquiries.

In item master maintenance the purchase unit is CT, the stock unit is CT
but the issue unit is KG, which I cannot change to CT in item master.

The conversions set-up in item master are  Stock->purchase conv..... 1 ,
Issue->stock conv........0.1 and Weight per selling unit.. 10



In stockroom details, first stockroom is correctly set up with a
purchase unit CT and issue unit CT. The second stockroom is set-up with
purchase unit CT and issue unit KG, which should be CT.

The system does not allow me to change the issue unit in the second
stockroom in stockroom details, nor in item maintenance. I can not
delete the  second stockroom and recreate it because the stock balance
is not zero; but when stock balance is zero the system will not allow me
because movements for the item exist.

Is there a way I can change the UOM in this second stockroom?

 
Sanne


------------------------------

message: 2
date: Thu, 19 Feb 2004 08:19:31 -0500
from: "Johnson, Duane" <djohnson@xxxxxxxxxxxxx>
subject: RE: [SYSTEM21]   different UOM in different stockrooms for
        same i tem

Sanne,

  I don't know if this is the correct way to do it, but how I always handle
problems like this (with no fallout so far) is to just use a file edit
utility (DBU, PFE, DFU, etc) and make the change to the record that is
causing the problem.

Duane

-----Original Message-----
From: system21-bounces@xxxxxxxxxxxx [mailto:system21-bounces@xxxxxxxxxxxx]
On Behalf Of Sanne Stewart
Sent: Wednesday, February 18, 2004 7:25 PM
To: system21@xxxxxxxxxxxx
Subject: [SYSTEM21] different UOM in different stockrooms for same item

Item exists in 2 different stockrooms and has been set-up with different
issue units (kg & ct) in the different stockrooms. This is visible in
the different item/stockroom enquiries.

In item master maintenance the purchase unit is CT, the stock unit is CT
but the issue unit is KG, which I cannot change to CT in item master.

The conversions set-up in item master are  Stock->purchase conv..... 1 ,
Issue->stock conv........0.1 and Weight per selling unit.. 10



In stockroom details, first stockroom is correctly set up with a
purchase unit CT and issue unit CT. The second stockroom is set-up with
purchase unit CT and issue unit KG, which should be CT.

The system does not allow me to change the issue unit in the second
stockroom in stockroom details, nor in item maintenance. I can not
delete the  second stockroom and recreate it because the stock balance
is not zero; but when stock balance is zero the system will not allow me
because movements for the item exist.

Is there a way I can change the UOM in this second stockroom?

 
Sanne
_______________________________________________
This is the System 21 Users (SYSTEM21) mailing list
To post a message email: SYSTEM21@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/system21
or email: SYSTEM21-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/system21.



------------------------------

message: 3
date: Thu, 19 Feb 2004 09:14:08 -0500
from: "Johnson, Duane" <djohnson@xxxxxxxxxxxxx>
subject: [SYSTEM21]   Planning stops in MRP/MPS

We have ONE part for which all MPS/MRP planning has stopped as of the middle
of April.  We have requirements set up for this part all the way thru the
end of the year.  What might cause this?

        Duane Johnson
        Information Technology Services
        Programming Manager
        Coleman Powermate Inc.
        4970 Airport Rd.
        Kearney, NE 68847
        djohnson@xxxxxxxxxxxxx



------------------------------

message: 4
date: Thu, 19 Feb 2004 09:21:47 -0500
from: Roy Cox <rcox@xxxxxxxxxxxxxxx>
subject: RE: [SYSTEM21]   Planning stops in MRP/MPS

Has the vendor been cancelled?

-----Original Message-----
From: Johnson, Duane [mailto:djohnson@xxxxxxxxxxxxx] 
Sent: Thursday, February 19, 2004 9:14 AM
To: 'System 21 Users'
Subject: [SYSTEM21] Planning stops in MRP/MPS

We have ONE part for which all MPS/MRP planning has stopped as of the middle
of April.  We have requirements set up for this part all the way thru the
end of the year.  What might cause this?

        Duane Johnson
        Information Technology Services
        Programming Manager
        Coleman Powermate Inc.
        4970 Airport Rd.
        Kearney, NE 68847
        djohnson@xxxxxxxxxxxxx

_______________________________________________
This is the System 21 Users (SYSTEM21) mailing list
To post a message email: SYSTEM21@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/system21
or email: SYSTEM21-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/system21.



------------------------------

message: 5
date: Thu, 19 Feb 2004 09:04:47 -0500
from: "Kincer, Alan" <akincer@xxxxxxxxx>
subject: [SYSTEM21]   Ship time

I need to have my EDI programmer map a delivery time into AIPX4 so that it
will find its way to ACP04 field TMDR04 (Time Delivery Required).

However in AIPX4 there are two time fields MSGTX1 and PDCTX1. Trying to
figure out which one the validation/acceptance programs might use to pocket
into TMDR04.

If anyone knows the answer to this it would be great. If not I would like to
know what program (there are apparently at least three possibilities) writes
out to ACP04 records so I can have him look at the source and trace the
postings.

Thank you!

Alan 
 


=== [ KI (USA) Corporation - http://www.kiusa.com ]
====================================== 
Tel. 859.986.1420  --  Fax. 859.986.1485 
This e-mail, including any attachments, contains information from KI (USA)
Corporation that may be confidential or privileged. Mail is intended only
for those to whom it is addressed. If you are not the intended recipient do
not copy, distribute, or take any action in reliance on the contents of this
message. 
If you have received this e-mail in error notify the sender immediately then
delete or destroy all electronic and hard copies of this communication,
including attachments. 
KI (USA) Corporation's anti-virus system checks for known viruses. However
you are advised to run your own virus check before opening any attachments
received. KI (USA) Corporation will not accept any liability once an e-mail
and/or any attachment is received. 
Views expressed in the e-mail are those of the author and not necessarily
those of KI (USA) Corporation. 
============================================================================




------------------------------

message: 6
date: Thu, 19 Feb 2004 09:44:06 -0500
from: "Lin Walsh" <lin@xxxxxxxxxxx>
subject: RE: [SYSTEM21]   Ship time

Alan,
I believe that you need to populate FSTTX4 in AIPX4 to get to TMDR04, or if
the same time is always required it can be set in Customer defaults in /ADM


-----Original Message-----
From: system21-bounces@xxxxxxxxxxxx [mailto:system21-bounces@xxxxxxxxxxxx]
On Behalf Of Kincer, Alan
Sent: Thursday, February 19, 2004 9:05 AM
To: system21@xxxxxxxxxxxx
Cc: Art Powell (ap9711757@xxxxxxxxx)
Subject: [SYSTEM21] Ship time

I need to have my EDI programmer map a delivery time into AIPX4 so that it
will find its way to ACP04 field TMDR04 (Time Delivery Required).

However in AIPX4 there are two time fields MSGTX1 and PDCTX1. Trying to
figure out which one the validation/acceptance programs might use to pocket
into TMDR04.

If anyone knows the answer to this it would be great. If not I would like to
know what program (there are apparently at least three possibilities) writes
out to ACP04 records so I can have him look at the source and trace the
postings.

Thank you!

Alan 
 


=== [ KI (USA) Corporation - http://www.kiusa.com ]
====================================== 
Tel. 859.986.1420  --  Fax. 859.986.1485 
This e-mail, including any attachments, contains information from KI (USA)
Corporation that may be confidential or privileged. Mail is intended only
for those to whom it is addressed. If you are not the intended recipient do
not copy, distribute, or take any action in reliance on the contents of this
message. 
If you have received this e-mail in error notify the sender immediately then
delete or destroy all electronic and hard copies of this communication,
including attachments. 
KI (USA) Corporation's anti-virus system checks for known viruses. However
you are advised to run your own virus check before opening any attachments
received. KI (USA) Corporation will not accept any liability once an e-mail
and/or any attachment is received. 
Views expressed in the e-mail are those of the author and not necessarily
those of KI (USA) Corporation. 
============================================================================


_______________________________________________
This is the System 21 Users (SYSTEM21) mailing list
To post a message email: SYSTEM21@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/system21
or email: SYSTEM21-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/system21.





------------------------------

message: 7
date: Thu, 19 Feb 2004 10:25:02 -0500
from: "Kincer, Alan" <akincer@xxxxxxxxx>
subject: [SYSTEM21]   RE: Ship time



Got it. I don't know why I was giving field examples from AIPX1. Anyway,
thanks Lin.

Alan

-----Original Message-----
From: Lin Walsh [mailto:lin@xxxxxxxxxxx] 
Sent: Thursday, February 19, 2004 9:44 AM
To: 'System 21 Users'
Cc: 'Art Powell'
Subject: RE: [SYSTEM21] Ship time

Alan,
I believe that you need to populate FSTTX4 in AIPX4 to get to TMDR04, or if
the same time is always required it can be set in Customer defaults in /ADM


=== [ KI (USA) Corporation - http://www.kiusa.com ]
====================================== 
Tel. 859.986.1420  --  Fax. 859.986.1485 
This e-mail, including any attachments, contains information from KI (USA)
Corporation that may be confidential or privileged. Mail is intended only
for those to whom it is addressed. If you are not the intended recipient do
not copy, distribute, or take any action in reliance on the contents of this
message. 
If you have received this e-mail in error notify the sender immediately then
delete or destroy all electronic and hard copies of this communication,
including attachments. 
KI (USA) Corporation's anti-virus system checks for known viruses. However
you are advised to run your own virus check before opening any attachments
received. KI (USA) Corporation will not accept any liability once an e-mail
and/or any attachment is received. 
Views expressed in the e-mail are those of the author and not necessarily
those of KI (USA) Corporation. 
============================================================================




------------------------------

message: 8
date: Thu, 19 Feb 2004 10:23:50 -0500
from: "Johnson, Duane" <djohnson@xxxxxxxxxxxxx>
subject: RE: [SYSTEM21]   Planning stops in MRP/MPS

It's a part that we manufacture.


-----Original Message-----
From: system21-bounces@xxxxxxxxxxxx [mailto:system21-bounces@xxxxxxxxxxxx]
On Behalf Of Roy Cox
Sent: Thursday, February 19, 2004 8:22 AM
To: 'System 21 Users'
Subject: RE: [SYSTEM21] Planning stops in MRP/MPS

Has the vendor been cancelled?

-----Original Message-----
From: Johnson, Duane [mailto:djohnson@xxxxxxxxxxxxx] 
Sent: Thursday, February 19, 2004 9:14 AM
To: 'System 21 Users'
Subject: [SYSTEM21] Planning stops in MRP/MPS

We have ONE part for which all MPS/MRP planning has stopped as of the middle
of April.  We have requirements set up for this part all the way thru the
end of the year.  What might cause this?

        Duane Johnson
        Information Technology Services
        Programming Manager
        Coleman Powermate Inc.
        4970 Airport Rd.
        Kearney, NE 68847
        djohnson@xxxxxxxxxxxxx

_______________________________________________
This is the System 21 Users (SYSTEM21) mailing list
To post a message email: SYSTEM21@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/system21
or email: SYSTEM21-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/system21.

_______________________________________________
This is the System 21 Users (SYSTEM21) mailing list
To post a message email: SYSTEM21@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/system21
or email: SYSTEM21-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/system21.



------------------------------

message: 9
date: Thu, 19 Feb 2004 10:40:01 -0500
from: "Grinstead, Scott" <SAGrinstead@xxxxxxxxxxxxxx>
subject: RE: [SYSTEM21]   Planning stops in MRP/MPS

Verify that the bill/route has not been affectively ended (if it is an
assembled item then this mean checking both the route that is used to
produce the item and the route where the item is consumed).

Also make sure on the item master that it also has have an item end date
assigned.

I am assuming that the production master detail hasn't been changed to
something that would prevent it from being planned.  One way to do this
would be to assigned the item as a forecast only item and not have a
forecast entered.


Scott Grinstead
Sr. Programmer/Analyst
Rocky Shoes & Boots



 -----Original Message-----
From:   Johnson, Duane [mailto:djohnson@xxxxxxxxxxxxx] 
Sent:   Thursday, February 19, 2004 10:24 AM
To:     'System 21 Users'
Subject:        RE: [SYSTEM21]   Planning stops in MRP/MPS

It's a part that we manufacture.


-----Original Message-----
From: system21-bounces@xxxxxxxxxxxx [mailto:system21-bounces@xxxxxxxxxxxx]
On Behalf Of Roy Cox
Sent: Thursday, February 19, 2004 8:22 AM
To: 'System 21 Users'
Subject: RE: [SYSTEM21] Planning stops in MRP/MPS

Has the vendor been cancelled?

-----Original Message-----
From: Johnson, Duane [mailto:djohnson@xxxxxxxxxxxxx] 
Sent: Thursday, February 19, 2004 9:14 AM
To: 'System 21 Users'
Subject: [SYSTEM21] Planning stops in MRP/MPS

We have ONE part for which all MPS/MRP planning has stopped as of the middle
of April.  We have requirements set up for this part all the way thru the
end of the year.  What might cause this?

        Duane Johnson
        Information Technology Services
        Programming Manager
        Coleman Powermate Inc.
        4970 Airport Rd.
        Kearney, NE 68847
        djohnson@xxxxxxxxxxxxx

_______________________________________________
This is the System 21 Users (SYSTEM21) mailing list
To post a message email: SYSTEM21@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/system21
or email: SYSTEM21-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/system21.

_______________________________________________
This is the System 21 Users (SYSTEM21) mailing list
To post a message email: SYSTEM21@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/system21
or email: SYSTEM21-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/system21.

_______________________________________________
This is the System 21 Users (SYSTEM21) mailing list
To post a message email: SYSTEM21@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/system21
or email: SYSTEM21-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/system21.


------------------------------

message: 10
date: Thu, 19 Feb 2004 16:11:22 +0000
from: "Jeff Klipa" <jklipa@xxxxxxxxxxx>
subject: RE: [SYSTEM21] Planning stops in MRP/MPS

Duane,

This is a symptom of your calendar not being set up far enough out into the 
future...  At least it is for us at V3.5.1.

I'm surprised it's only one part that is giving you the symptom though...  
So I'm not 100% convinced...  Do you have any other parts scheduled out past

this part...?  What is the End Date on the MPS/MRP screen when you run 
it...?

Just humor me and examine your Inventory calendar and your manufacturing 
calendar and make sure they are set up at least through 2005...  You always 
want to have 2 years of future calendar dates set up in all the apps...

Vendor scheduling also exhibits this symptom when the schedule horizon 
exceeds the available calendar dates...

Let me know...
Thanks.
----Original Message Follows----
From: "Grinstead, Scott" <SAGrinstead@xxxxxxxxxxxxxx>
Reply-To: System 21 Users <system21@xxxxxxxxxxxx>
To: "'System 21 Users'" <system21@xxxxxxxxxxxx>
Subject: RE: [SYSTEM21]   Planning stops in MRP/MPS
Date: Thu, 19 Feb 2004 10:40:01 -0500

Verify that the bill/route has not been affectively ended (if it is an
assembled item then this mean checking both the route that is used to
produce the item and the route where the item is consumed).

Also make sure on the item master that it also has have an item end date
assigned.

I am assuming that the production master detail hasn't been changed to
something that would prevent it from being planned.  One way to do this
would be to assigned the item as a forecast only item and not have a
forecast entered.


Scott Grinstead
Sr. Programmer/Analyst
Rocky Shoes & Boots



  -----Original Message-----
From:   Johnson, Duane [mailto:djohnson@xxxxxxxxxxxxx]
Sent:   Thursday, February 19, 2004 10:24 AM
To:     'System 21 Users'
Subject:        RE: [SYSTEM21]   Planning stops in MRP/MPS

It's a part that we manufacture.


-----Original Message-----
From: system21-bounces@xxxxxxxxxxxx [mailto:system21-bounces@xxxxxxxxxxxx]
On Behalf Of Roy Cox
Sent: Thursday, February 19, 2004 8:22 AM
To: 'System 21 Users'
Subject: RE: [SYSTEM21] Planning stops in MRP/MPS

Has the vendor been cancelled?

-----Original Message-----
From: Johnson, Duane [mailto:djohnson@xxxxxxxxxxxxx]
Sent: Thursday, February 19, 2004 9:14 AM
To: 'System 21 Users'
Subject: [SYSTEM21] Planning stops in MRP/MPS

We have ONE part for which all MPS/MRP planning has stopped as of the middle
of April.  We have requirements set up for this part all the way thru the
end of the year.  What might cause this?

        Duane Johnson
        Information Technology Services
        Programming Manager
        Coleman Powermate Inc.
        4970 Airport Rd.
        Kearney, NE 68847
        djohnson@xxxxxxxxxxxxx

_________________________________________________________________
Dream of owning a home? Find out how in the First-time Home Buying Guide. 
http://special.msn.com/home/firsthome.armx



------------------------------

_______________________________________________
This is the System 21 Users (SYSTEM21) digest list
To post a message email: SYSTEM21@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/system21
or email: SYSTEM21-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/system21.



End of SYSTEM21 Digest, Vol 2, Issue 44
***************************************
###########################################

This message has been scanned by F-Secure Anti-Virus for Microsoft Exchange.
For more information, connect to http://www.F-Secure.com/

As an Amazon Associate we earn from qualifying purchases.

This thread ...


Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.