MF99008 I have installed as of 5/914, PTF was created 2/14/14.
TR8 due out June 6.
The next cumulative package is scheduled for 20 June 2014.
So time for some serious PTF planning.
Paul
-----Original Message-----
From: MIDRANGE-L [mailto:midrange-l-bounces@xxxxxxxxxxxx] On Behalf Of rob@xxxxxxxxx
Sent: Thursday, May 15, 2014 1:22 PM
To: Midrange Systems Technical Discussion
Subject: RE: Power 8 and 7.1TR8
Ok, once again, MF99008 is NOT TR8. It is "LIC Base Function to Enable Technology Refresh". It is the enabling ptf to make your system ready for TR8.
It is not currently on any cume media as per
http://www-912.ibm.com/systems/electronic/support/a_dir/as4ptf.nsf/ALLPTFS/MF99008
That cume is quite old by the way.
It is not supposed to be on the hiper, based on
http://www-912.ibm.com/systems/electronic/support/s_dir/SLINE003.NSF/PTFbyNumber/SF99709
However, there's always the possibility that some PTF got added to the hiper which would then require MF99008 and download it as a prereq.
Also, keeping in mind that the latest hiper and the latest DB2 group always come down with any cume order, if the hiper group has it listed as a prereq I can see how you might think it's on the cume.
The question is then: What is REALLY required to run 7.1 on Power 8?
- MF99008 and it's coreq's and prereqs
- The full TR8?
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1 Group Dekko Dept 1600 Mail to: 2505 Dekko Drive
Garrett, IN 46738
Ship to: Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
From: "Carey, Jeffrey" <Jeffrey.Carey@xxxxxxxxxxxxxxx>
To: Midrange Systems Technical Discussion <midrange-l@xxxxxxxxxxxx>
Date: 05/15/2014 12:09 PM
Subject: RE: Power 8 and 7.1TR8
Sent by: "MIDRANGE-L" <midrange-l-bounces@xxxxxxxxxxxx>
I just found that while the current cumulative PTF (1398) includes TR8
(marker PTF MF99008). However the TR group PTF (SF99707) still shows as
level 7. It looks like the planned availability is 6/6/14 for SF99707
Level 8, although TR8 will still be installed with Cumulative 1398...
-----Original Message-----
From: MIDRANGE-L [mailto:midrange-l-bounces@xxxxxxxxxxxx] On Behalf Of
Charles Wilt
Sent: Monday, April 28, 2014 2:53 PM
To: Midrange Systems Technical Discussion
Subject: Re: Power 8 and 7.1TR8
I thought it was 7.2 going GA Friday...
The POWER8 hardware still being a couple months out..
Charles
On Mon, Apr 28, 2014 at 3:34 PM, <rob@xxxxxxxxx> wrote:
So, if Power 8 and it's ability to run 7.1TR8 is GA Friday, does that
mean
7.1TR8 will be GA Friday or earlier?
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1 Group Dekko Dept 1600
Mail to: 2505 Dekko Drive
Garrett, IN 46738
Ship to: Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
From: DrFranken <midrange@xxxxxxxxxxxx>
To: Midrange Systems Technical Discussion <midrange-l@xxxxxxxxxxxx>
Date: 04/28/2014 01:59 PM
Subject: Re: Power 8 and 7.1TR8
Sent by: "MIDRANGE-L" <midrange-l-bounces@xxxxxxxxxxxx>
As usual MF99008 is 'just a PTF' so you will want the entire TR group.
While it is very likely that the needed hardware support is in MF99008
there may very well be subsequent fixes you'll want that come in the
group itself.
- Larry "DrFranken" Bolhuis
www.frankeni.com
www.iDevCloud.com
www.iInTheCloud.com
On 4/28/2014 1:14 PM, rob@xxxxxxxxx wrote:
Is just MF99008 (which is currently out there) all that is needed?
Or will level 8 of SF99707 also be needed?
http://www.ibm.com/servers/eserver/iseries/support/s_dir/SLINE003.NSF/
PTFbyNumber/SF99707
Rob Berendt
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing
list To post a message email: MIDRANGE-L@xxxxxxxxxxxx To subscribe,
unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx Before posting, please take
a moment to review the archives at
http://archive.midrange.com/midrange-l.
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing
list To post a message email: MIDRANGE-L@xxxxxxxxxxxx To subscribe,
unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx Before posting, please take
a moment to review the archives at
http://archive.midrange.com/midrange-l.
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing
list To post a message email: MIDRANGE-L@xxxxxxxxxxxx To subscribe,
unsubscribe, or change list options,
visit:
http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx Before posting, please take a
moment to review the archives at
http://archive.midrange.com/midrange-l.
This communication, including any attachments, may contain information
that is confidential and may be privileged and exempt from disclosure
under applicable law. It is intended solely for the use of the individual
or entity to which it is addressed. If you are not the intended recipient,
you are hereby notified that any use, disclosure, dissemination, or
copying of this communication is strictly prohibited. If you have received
this communication in error, please notify the sender. Thank you for your
cooperation.
As an Amazon Associate we earn from qualifying purchases.