|
See also from the migration section of Infocenter athttp://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzamc/rzamcmig
Preparing for the migration from a System i model that does not supportOnly
IBM i 7.1
Right below the link for "Restoring previous release user data to a new
system" you'll see
The preferred method to restore previous release user data on your new,
target system is to use the migration method.
The migration method asks you to first install the new, current release
onto your old, source system. After which, you save your old system and
then you perform a full system recovery onto the new, target system.
use these instructions if it is not possible to perform the preferredthe
migration process referenced in the Data migrations topic.
Notice there's a lot of manual recreation using the "Restoring previous
release user data to a new system" steps instead of just upgrading your
source system to 7.1 first. For example this is one of them from the
manual
Add job scheduler entries with the Add Job Schedule Entry (ADDJOBSCDE)
command using the information you printed from your source system. Use
Work with Job Schedule Entries (WRKJOBSCDE) command and select the printfrom
option.
Now, we have a few hundred job schedule entries. Granted some might say
why not just restore the *JOBSCD object? Question this, why didn't IBM
just tell you that? Did they reformat that at some release that would
have been addressed if you had done a normal migration (by updating your
source system first)? Let me give you an example. Let's say you go
2.1 of BPCS to 8.3. You decide to skip all the migration steps thatBPCS
had for data conversions in between. Do you think you could justrestore
the 2.1 item master (IIM) file and have it work?any
I'm not saying it's impossible to upgrade this way; evidently numerous
people have. I am just saying that you may not end up saving yourself
work and there's been a number of people on this list that's taken overa
year to clean up a mess caused by doing it this way.user
The OP came from Mount Olive Pickles. I would suspect there might be a
slow time of the year in which they could do this over two weekends. OS
upgrade one weekend and the hardware upgrade on another. There's a
company called Red Gold (a tomato processor) which attends our local
group and I am just going by some of the stuff I've heard from them.a
If 24x7x365 is really a necessity then I'd argue they really should have
HA environment and should switch over to their backup machine andstagger
the upgrades that way.
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1
Group Dekko
Dept 1600
Mail to: 2505 Dekko Drive
Garrett, IN 46738
Ship to: Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.