Glen,
You CAN do the back up and restore directly to a POWER7!!. Furthermore
if your OS is up on maintenance you can transfer the licenses for the LPPs.
The ONLY change is the hardware system serial number if you get a new
POWER7 directly. That is an IRS requirement because the POWER7 is so
much bigger than the POWER5 IRS won't let you upgrade the asset for
accounting purposes.
If you go the double upgrade route (only an accountant would care if the
POWER5 is not written off the books yet) then back up/restore to the
POWER6 box, run 60 days, backup/restore to your new POWER7 box and go.
Personally I'd just get the new box.
Jim Oberholtzer
CEO/Chief Technical Architect
Agile Technology Architects, LLC
On 2/15/2011 10:45 AM, Glenn Hopwood wrote:
My basic question is: Why can't I do a save/restore from my old hardwaremodels
(Power 5+) to my new hardware (Power 7) just like we've done numerous
times before (assuming the OS is supported on both systems)?
Why do I need to purchase and then discard a Power 6 machine or
re-purchase the OS (new serial number)?
Glenn
On 2/15/2011 10:22 AM, Dan wrote:
Glenn, is your question "what release can I run on which server?" or
"how do I upgrade and preserve my serial number?"
Some things that might help you:
1. IBM maintains a web page which shows which Power and System i
http://www-947.ibm.com/systems/support/i/planning/upgrade/osmapping.htmlwork with which releases of IBM i:
POWER6
2. As Larry pointed out, IBM doesn't offer an upgrade from POWER5
directly to POWER7. There are some upgrade paths from POWER5 to
upgrades(from which you can upgrade to POWER7) but I believe that these
keepwill be withdrawn from marketing May 27, 2011.
3. Going back to Jerry's original question, I wonder if what someone
said was that since upgrades from POWER5 to POWER6 go away May 27, in
June or later you can't two-step upgrade a POWER5 box to POWER7 and
confusedyour serial number. Maybe "POWER7" and "IBM i version 7" got
thein someone's memory. Or maybe it's me that's confused. Happens all
youtime.
4. If you don't care about preserving your server's serial number,
ican replace your POWER5+ server with a new POWER7 server running IBM
like to6.1 or 7.1 now, or in June, or whenever you like.
-Dan R., IBM Power Systems Tech Specialist
On 2/15/2011 9:21 AM, Glenn Hopwood wrote:
Larry,
Can you expand on this? We are currently on a Power 5+ and would
soget to a Power 7. I don't see a technical reason why we can't go
straight to the 7...
Glenn
On 2/11/2011 11:16 PM, DrFranken wrote:
If you have a POWER5 or 5+ machine you can already run IBM i 7.1
POWER7 thenyou're good. But on the other hand if you want to get up to
(twoyou would need to either upgrade to POWER6 and THEN to POWER7
get asteps) to keep the same serial number or you buy a new POWER7 and
--new serial number.
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.