× The internal search function is temporarily non-functional. The current search engine is no longer viable and we are researching alternatives.
As a stop gap measure, we are using Google's custom search engine service.
If you know of an easy to use, open source, search engine ... please contact support@midrange.com.



I'm looking for some help from the hardware experts on the list.

I have a 9406-270 with a 5075 tower. The tower to this point was only
used for IOAs to drive some external tape drives.

We decided to add DASD to the tower. We did an MES config and ordered
the parts. They are used but certified parts from AVNET.



From the Configuration:




Product


Description


Qty


Purchase

Extended
Purchase

Extended
Maint



Hardware MESs

9406-270

iSeries Server

1




Additions

0002

Customer Install MES

1

N/C

N/C


2782

PCI-X RAID Disk Unit Ctrl

1

3,000.00

3,000.00


2844

PCI IOP

1

2,300.00

2,300.00


2924

English

1

N/C

N/C


4318

17.54GB 10k rpm Disk Unit

4

1,000.00

4,000.00



--------------------------------------------------------------------------
Scott Schollenberger
Vice President, Research & Development

P: 610-239-9988 x305
F: 610-239-9995
E: schollenbergers@xxxxxxxxxxxxxxxxxx
http://www.harriscomputer.com/
100-2011 Renaissance Blvd.
King of Prussia, PA
19406
http://www.harriscomputer.com

This message is intended exclusively for the individual or entity to which it is addressed. This communication may contain information that is proprietary, privileged or confidential or otherwise legally exempt from disclosure. If you are not the named addressee, you are not authorized to read, print, retain, copy or disseminate this message or any part of it. If you have received this message in error, please notify the sender immediately by e-mail and delete all copies of the message.

________________________________

________________________________

________________________________

Serial: 0000848CB

Total

USD 9,300.00





This config only shows adding 4 4318s but we added 6 4318s.



I had to move some of the existing cards in the 5075 into different
slots.

I used SPT to develop a new sysplan for the system.

Here is that report.



Top of Form

IBM System Planning Tool





System plan:

RANDOR3 270-Revision with disk in 5075



Report

This page contains the report for your system plan.



LPAR Validation Tool Report - Detail

RADNOR3-Disk in 5075



Version.............:

Description.........: LVT - Detail

Date................: Thu Jul 02 07:52:16 EDT 2009

Validations Done....: Hardware, Partition, Console, Load Source

Hardware status.....: Valid configuration

- WARNING -- switching SCSI tape cards that

can potentially control disk (for example 5712)

may not be switched between dissimilar
operating

systems.

- WARNING -- partition hardware may be

installed in migration towers and cannot be

accounted for by the LPAR validation tool

- WARNING -- when a 2749 attaches a 3995

Optical Library DataServer, the 2749 must not
be

placed under the same IOP which drives the Load

Source DASD

IT IS THE USER'S RESPONSIBILITY TO ENSURE THAT

ALL PARTITION REQUIREMENTS ARE MET.

Partition status....: Valid configuration

Console status......: Valid configuration

Load Source status..: Valid configuration

Disclaimer..........: This LPAR validation is provided "as is" without

warranty of any kind. IBM is not responsible for

items ordered or not ordered as a result of this

output. IBM DISCLAIMS ANY AND ALL EXPRESS AND

IMPLIED WARRANTIES AND CONDITIONS INCLUDING, BUT

NOT LIMITED TO, THE WARRANTIES AND CONDITIONS OF

MERCHANTABILITY AND FITNESS FOR A PARTICULAR

PURPOSE. IBM WILL NOT BE LIABLE FOR ANY DIRECT,

INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY,

PUNITIVE OR CONSEQUENTIAL DAMAGES WITH RESPECT

TO THE LPAR VALIDATION.

Warning.............: The output of this tool displays the parts

placement required for the partitions you have

defined. As you configure your order using

eConfig you will have the opportunity to ask

that IBM manufacturing place these parts per the

LVT designations for the 9406-570, 9406-595,

9117-570, 9118-575, 9119-590 and 9119-595 system

using the Customer Specified Placement (CSP)

feature. Access the following website for more

details

http://www-1.ibm.com/servers/eserver/power/csp

If this CSP feature is not selected IBM

manufacturing will place all the parts assuming

they are in a single partition system. It is

the customer responsibility to move the parts

for the customized partitioning. IBM services

are available for a fee to perform this

placement if requested. Please be advised that

verification of disk placement with respect to

data protection restrictions has NOT been

completed for this system. If this system will

be utilizing the customer specified placement

program it is your responsibility to ensure that

data protection restrictions are met as

verification of these requirements will NOT be

completed during the manufacturing process.

Please ensure that placement of all internal

disks is in compliance with the restrictions of

the data protection defined for the system. For

additional information with respect to data

protection restrictions please consult the IBM

product documentation.

Warning.............: It is strongly recommended that you do capacity

planning for the workload planned in each

partition and then determine the LPAR

configuration required to achieve the desired

performance and room for growth in that

partition.

Warning.............: Warning - The 5705 can drive internal disk and an

external tape or DVD. However, in a LPAR system,

when the 5705 is used in a secondary partition

for the partition load source disk, an external

tape or DVD that is also attached cannot be used

as an ALT IPL device for that partition.



-- System Selections ( RADNOR3-Disk in 5075 ) --

------------------------------------------------------------------------

Primary Partition OS Level..: V5R2M0

System Model................: iSeries Model 9406_270

Processor/Package Feature...: 2432 - Model 270 (SStar) Uni 1070 CPW

Interactive Feature.........: 1519 - 50 CPW 5250 Interactive Card

System Memory (GB)..........: 2.0

Total Processors............: 1

Dedicated Processors........: 1

Shared Processors...........: 0.0

Batch CPW...................: 1070

Interactive CPW.............: 50

Total Partitions............: 1



-- Partition Specifications ( RADNOR3-Disk in 5075 ) --

Partition OS Ver Shared # Procs Batch CPW Mem (MB) Int % Int CPW

------------------------------------------------------------------------

Primary V5R2M0 N 1.00 1070 2048 0.0 0

------------------------------------------------------------------------

Totals --- --- 1.00 1070 2048 0.0 0



-- Partition Specifications ( RADNOR3-Disk in 5075 ) --

OS

Partition Version Memory Console Load Source

------------------------------------------------------------------------

Primary V5R2M0 2048 9406_270-0\C06
9406_270-0\C01

------------------------------------------------------------------------

Totals ------ 2048



-- Virtual I/O Details ( RADNOR3-Disk in 5075 Partition 1 V5R2M0 ) --

Virtual

Slot ID Slot Type Value

------------------------------------------------------------------------
----------------



-- Tower Properties --

9406_270-0 -- iSeries Model 9406_270

------------------------------------------------------------------------

Slot Partition Device Description

------------------------------------------------------------------------

DB3 Primary None Disk drive slot


DB3(a) Primary None Disk drive slot


DB3(b) Primary None Disk drive slot


DB3(c) Primary None Disk drive slot


DB3(d) Primary None Disk drive slot


DB3(e) Primary None Disk drive slot


DB2 Primary None Disk drive slot


DB2(a) Primary None Disk drive slot


DB2(b) Primary None Disk drive slot


DB2(c) Primary None Disk drive slot


DB2(d) Primary None Disk drive slot


DB2(e) Primary None Disk drive slot


DB1 Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


DB1(a) Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


DB1(b) Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


DB1(c) Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


DB1(d) Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


DB1(e) Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


D08 Primary - C01 4584 30GB 1/4 inch Cartridge Tape


D07 Primary - C01 4525 CDROM


++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

C02 Primary 2749 Ultra Magnetic Media Ctlr
B

C03 Primary None IOP/IOA
U

C04 Primary None IOP/IOA/IXS
S

C05 Primary 4838 100/10 Mbps Ethernet
#

C06 Primary 4746 Twinaxial Workstation
1

C01 Primary 4748 RAID Disk Unit Ctlr


C07 Primary None ECS


EMB Primary 284x Embedded IOP


------------------------------------------------------------------------



5075-1 -- Expansion Tower

------------------------------------------------------------------------

Slot Partition Device Description

------------------------------------------------------------------------

++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

DB1 Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


DB1(a) Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


DB1(b) Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


DB1(c) Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


DB1(d) Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


DB1(e) Primary - C01 4318x1 17.54GB 10k RPM Disk Unit


++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

C08 Primary 4745 2 Line WAN
B

C07 Primary 2768 Magnetic Media Ctlr
U

C06 Primary 2749 Ultra Magnetic Media Ctlr
S

C05 Primary 2844 64 MB IOP
#




++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

C04 Primary 4838 100/10 Mbps Ethernet
B

C03 Primary 2842 32 MB IOP (9406_270)
U

C02 Primary 4745 2 Line WAN
S

C01 Primary 2782 RAID Disk Unit Ctlr
#

EMB Primary 284x Embedded IOP





------------------------------------------------------------------------



- - - End of System Detail ( RADNOR3-Disk in 5075 ) - - -









LPAR Validation Tool Report - Summary

RADNOR3-Disk in 5075



Version.............:

Description.........: LVT - Summary

Date................: Thu Jul 02 07:52:16 EDT 2009

Validations Done....: Hardware, Partition, Console, Load Source

Hardware status.....: Valid configuration

- WARNING -- switching SCSI tape cards that

can potentially control disk (for example 5712)

may not be switched between dissimilar
operating

systems.

- WARNING -- partition hardware may be

installed in migration towers and cannot be

accounted for by the LPAR validation tool

- WARNING -- when a 2749 attaches a 3995

Optical Library DataServer, the 2749 must not
be

placed under the same IOP which drives the Load

Source DASD

IT IS THE USER'S RESPONSIBILITY TO ENSURE THAT

ALL PARTITION REQUIREMENTS ARE MET.

Partition status....: Valid configuration

Console status......: Valid configuration

Load Source status..: Valid configuration

Disclaimer..........: This LPAR validation is provided "as is" without

warranty of any kind. IBM is not responsible for

items ordered or not ordered as a result of this

output. IBM DISCLAIMS ANY AND ALL EXPRESS AND

IMPLIED WARRANTIES AND CONDITIONS INCLUDING, BUT

NOT LIMITED TO, THE WARRANTIES AND CONDITIONS OF

MERCHANTABILITY AND FITNESS FOR A PARTICULAR

PURPOSE. IBM WILL NOT BE LIABLE FOR ANY DIRECT,

INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY,

PUNITIVE OR CONSEQUENTIAL DAMAGES WITH RESPECT

TO THE LPAR VALIDATION.

Warning.............: The output of this tool displays the parts

placement required for the partitions you have

defined. As you configure your order using

eConfig you will have the opportunity to ask

that IBM manufacturing place these parts per the

LVT designations for the 9406-570, 9406-595,

9117-570, 9118-575, 9119-590 and 9119-595 system

using the Customer Specified Placement (CSP)

feature. Access the following website for more

details

http://www-1.ibm.com/servers/eserver/power/csp

If this CSP feature is not selected IBM

manufacturing will place all the parts assuming

they are in a single partition system. It is

the customer responsibility to move the parts

for the customized partitioning. IBM services

are available for a fee to perform this

placement if requested. Please be advised that

verification of disk placement with respect to

data protection restrictions has NOT been

completed for this system. If this system will

be utilizing the customer specified placement

program it is your responsibility to ensure that

data protection restrictions are met as

verification of these requirements will NOT be

completed during the manufacturing process.

Please ensure that placement of all internal

disks is in compliance with the restrictions of

the data protection defined for the system. For

additional information with respect to data

protection restrictions please consult the IBM

product documentation.

Warning.............: It is strongly recommended that you do capacity

planning for the workload planned in each

partition and then determine the LPAR

configuration required to achieve the desired

performance and room for growth in that

partition.

Warning.............: Warning - The 5705 can drive internal disk and an

external tape or DVD. However, in a LPAR system,

when the 5705 is used in a secondary partition

for the partition load source disk, an external

tape or DVD that is also attached cannot be used

as an ALT IPL device for that partition.



Partitions..........: 1



Feature Code Primary -- -- --

------------------------------------------------------------------------

1519 0 0 0 0

2432 0 0 0 0

2749 2 0 0 0

2768 1 0 0 0

2782 1 0 0 0

2842 1 0 0 0

2844 1 0 0 0

4318 12 0 0 0

4525 1 0 0 0

4584 1 0 0 0

4745 2 0 0 0

4746 1 0 0 0

4748 1 0 0 0

4838 2 0 0 0

5075 0 0 0 0



Feature Code Sw-LPAR Sw-IASP-IOP Sw-IASP-TWR

------------------------------------------------------------------------

1519 0 0 0

2432 0 0 0

2749 0 0 0

2768 0 0 0

2782 0 0 0

2842 0 0 0

2844 0 0 0

4318 0 0 0

4525 0 0 0

4584 0 0 0

4745 0 0 0

4746 0 0 0

4748 0 0 0

4838 0 0 0

5075 0 0 0



Feature Code Description Total

------------------------------------------------------------------------

1519 50 CPW 5250 Interactive Card 1

2432 Model 270 (SStar) Uni 1070 CPW 1

2749 Ultra Magnetic Media Ctlr 2

2768 Magnetic Media Ctlr 1

2782 RAID Disk Unit Ctlr 1

2842 32 MB IOP (9406_270) 1

2844 64 MB IOP 1

4318 17.54GB 10k RPM Disk Unit 12

4525 CDROM 1

4584 30GB 1/4 inch Cartridge Tape 1

4745 2 Line WAN 2

4746 Twinaxial Workstation 1

4748 RAID Disk Unit Ctlr 1

4838 100/10 Mbps Ethernet 2

5075 Expansion Tower 1



- - - End of System Summary ( RADNOR3-Disk in 5075 ) - - -



* * * * * END OF REPORT * * * * *







Bottom of Form



I installed the cards into the 5075 based on this plan. When the system
comes up into DST or a full IPL, it sees all the cards in their new
positions but it doesn't see any of the 4318s I installed.

I've reseated all the drives and that didn't help.



Is it possible the sysplan is valid but the 2782 isn't in a slot where
it can "see" the disk units?



Any help is appreciated. Thanks, Scott






As an Amazon Associate we earn from qualifying purchases.

This thread ...

Follow-Ups:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.