×
The internal search function is temporarily non-functional. The current search engine is no longer viable and we are researching alternatives.
As a stop gap measure, we are using Google's custom search engine service.
If you know of an easy to use, open source, search engine ... please contact support@midrange.com.
Please note that they were both introduced at the same time, V2R1.
Al
Al Barsa, Jr.
Barsa Consulting Group, LLC
400>390
"i" comes before "p", "x" and "z"
e gads
Our system's had more names than Elizabeth Taylor!
914-251-1234
914-251-9406 fax
http://www.barsaconsulting.com
http://www.taatool.com
http://www.systemiconnection.com/
PaulMmn
<PaulMmn@xxxxxxxx
m.com> To
Sent by: Midrange Systems Technical
midrange-l-bounce Discussion
s@xxxxxxxxxxxx <midrange-l@xxxxxxxxxxxx>
cc
Peter Vidal <Peter_Vidal@xxxxxxxx>
01/19/2008 12:03 Subject
AM Re: program's last run date
Please respond to
Midrange Systems
Technical
Discussion
<midrange-l@midra
nge.com>
Remember that the DAYS USED has to be used in conjunction with the
"Days Used Reset On" date-- if the DURO date is blank, the DAYS USED
is the number of times the object was used since it was created,
otherwise the # of times since the DURO date.
--Paul E Musselman
Paulmmn@xxxxxxxxxxxxxxxxxxxx
At 1:39 PM -0500 1/18/08, Peter Vidal wrote:
DSPOBJD OBJ( MyLib / MyPgm ) OBJTYPE(*PGM) DETAIL(*FULL)
then, on the second page you will see LAST USED DATE and even the DAYS
USED count.
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit:
http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at
http://archive.midrange.com/midrange-l.
As an Amazon Associate we earn from qualifying purchases.