|
So, what do YOU do? How do you come to the determination of neededbattery
time? Do you just want to handle one time through, or more?
At a prior employer, I wrote the UPS power handling programs. One ran
when the UPS was running (i.e. discharging the batteries). It
decremented a 'battery time left' data area for each minute it was on.
(dlyjob) If it reached the 'gotta stop now' limit, it forced a shutdown.
There was a second program that was a NEP that incremented the data area
once every 5 minutes, but only if the discharge program was not active.
This way if there were multiple outages, the 'remaining capacity'
count was reasonable (but low, on the side of caution.)
The flaw in the ointment was when the S/38, er, System i was powered
down for a long time after the UPS was exhausted. The data area would
read 'low' but the actual batteries were fully charged. Never automated
that, but had a note on the console to check the UPS capacity and adjust
the data area when IPLing.
--buck
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing
list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2025 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.