|
Vern
I have resumed this again after getting dragged into several other, um, things. See below.
I have looked at the obvious wrkobjlck in a CL program, but use of it to get the jobs & end them in a CL program was not too obvious. What methods do you all use to accomplish this?
Original Question: >> Is there a way to break all object locks on a file? This would be used in batch jobs (CL) before an update program (RPG) or perhaps a backup is run.
Reply: >> End all the jobs that have a lock on the file. Do it all the time in our backups.
Rob Berendt -- Group Dekko Services, LLC Dept 01.073 PO Box 2000 Dock 108 6928N 400E Kendallville, IN 46755 -- This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list To post a message email: MIDRANGE-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/midrange-l or email: MIDRANGE-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/midrange-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.