Dale,

This process is described in the MRP manual and the function offers some
amount of flexability.  It is a matter of setting the codes in the warehouse
master to define if the warehouse is a demand or supplying location.  If a
warehouse is a demand location then it can be linked to a planning
warehouse.  MRP will see the inventory and the demand from the demand
warehouse and combine it with the planning warehouse.  

Gary Sutton

-----Original Message-----
From: mapics-l-bounces+gary.sutton=goodmanmfg.com@xxxxxxxxxxxx
[mailto:mapics-l-bounces+gary.sutton=goodmanmfg.com@xxxxxxxxxxxx]On
Behalf Of DaleGindlesperger@xxxxxxxxxxx
Sent: Monday, November 01, 2004 7:46 AM
To: MAPICS ERP System Discussion
Subject: RE: MRP Requirements







Dale,

We did this for a while, ended up changing away from it (nothing wrong with
the system - user lock was the problem).  Go to IM, (7) File Maintenance,
(12) Work with Warehouses.  You can set your planning parameters there.  I
have a lot of experience with this, and Jeff Snyder (who also participates
in this thread) is better than me at it.

Dale Gindlesperger
IT Manager/Special Projects Leader
Fleetwood Folding Trailers, Inc.
258 Beacon Street
Somerset, PA  15501




                                                                           
             "Walker, Dale"                                                
             <DWalker@automati                                             
             cproducts.com>                                             To 
             Sent by:                  "MAPICS ERP System Discussion"      
             mapics-l-bounces@         <mapics-l@xxxxxxxxxxxx>             
             midrange.com                                               cc 
                                                                           
                                                                   Subject 
             10/30/2004 08:08          RE: MRP Requirements                
             AM                                                            
                                                                           
                                                                           
             Please respond to                                             
             MAPICS ERP System                                             
                Discussion                                                 
             <mapics-l@midrang                                             
                  e.com>                                                   
                                                                           
                                                                           




Thanks Gary. What warehouse master settings would need to be changed to
accomplish this? Point me in the right direction and I'll stick my nose
in the manual for awhile.

Dale Walker


-----Original Message-----
From: mapics-l-bounces@xxxxxxxxxxxx
[mailto:mapics-l-bounces@xxxxxxxxxxxx] On Behalf Of Sutton, Gary
Sent: Friday, October 29, 2004 2:28 PM
To: 'MAPICS ERP System Discussion'
Subject: RE: MRP Requirements

Dale,

You can use the warehouse relationship and setup the part warehouse as a
demand warehouse and associate it with the production warehouse where
MRP is
run.  This allows you to let MRP to see the requirements from the demand
warehouse and include it with the production warehouse rquirements and
create a complete MRP material plan.

Gary Sutton

-----Original Message-----
From: mapics-l-bounces@xxxxxxxxxxxx
[mailto:mapics-l-bounces@xxxxxxxxxxxx]On Behalf Of Walker, Dale
Sent: Friday, October 29, 2004 2:16 PM
To: MAPICS ERP System Discussion
Subject: MRP Requirements


I am attempting to find a quick solution to our spare parts assembly
needs and am seeking advice.



Our spare parts warehouse (4) and production warehouse (1) are separate.


MRP runs in the production warehouse; not in the parts warehouse.

We want to cut MOs in production to build assemblies for spare parts.



Here is the plan being considered:

*      Establish safety stock levels for the top "X" number of higher
volume parts assemblies in the spare parts WH.

*      Run a nightly job that will create MRP demand in the production
WH for spare part assemblies if the safety stock level is infringed
upon.

o       These release exception messages could all appear under a
specific planner so that they are centrally managed by the production
control team



What are some other alternatives that we should consider?

Is the "REQMTS" file the MRP file that we need to populate to initiate
the demand for spare parts items?

Are there ways to configure the warehouse masters to accomplish this in
a more efficient or standardized way?

Other comments or ideas?



Thanks in advance,

Dale Walker







Dale Walker

VP, Management Information Systems

Gross-Given Mfg. Co. / Automatic Products Intnl'

St. Paul, MN



direct       651-290-4349

fax           651-224-5559

cell          651-270-4150



dwalker@xxxxxxxxxxxxxxxxxxxxx

www.automaticproducts.com <http://www.automaticproducts.com/>



_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.


_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.





_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.

As an Amazon Associate we earn from qualifying purchases.

This thread ...

Follow-Ups:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.