|
Al, This doesn't change in any later release of MAPICS. The "T" means that there is something inconsistent in the data at this level of the BOM & Routing. In your example, you have choosen to cost the item using a Routing. Then you've indicated that no routing steps are active. That actually has no impact on the cost calculations. But if the standard cost fields are calculated to 0 (that is, run labbor/machine times are set to 0 or the rate per hour is 0) then there is no labor cost. MAPICS considers this inconsistent for a manufactured item. I have two suggestions for your situation. If you want to use the MO document to process the kit, then change the item type = 9. This will effectively treat the item as purchased from a costing perspective. That will prevent the "T" in the status flags for this item. It will also still allow you to attach a BOM & Routing to the item. My other option would be to use the Kit Pick List function in COM to list the components that need to be pulled from stock and packed together. I suspect you have already considered that and that's why you use the MO as you do. Hope that helps. Mike message: 1 date: Tue, 02 Sep 2003 13:49:04 -0400 from: "Al Gershen" <aldg3@xxxxxxxxxxx> subject: Clearing Cur/Std Cost Status 'T" on a Kit Part Environment: Mapics DB (Mod4) with PDM Hi group: We have assigned a single Item Number to a group of parts that we sell to customers as a kit. The Item Number is coded as Item Type 2 (Manufactured Component) so that a routing is created. On it's routing, it has two steps (Kit Parts and Final Quality Check). Both of these steps have NO standard labor hours shown and the Operation Status Code is set at 00 (Inactive) for both steps. The routing is necessary as a memo item to accompany the Manufacturing Order (MO) so that it is filled correctly and checked after being filled. Labor for these steps is charged to Manufacturing Overhead accounts and not to the MO. The customer is billed for the parts only with no labor associated with the order. If you look at the Item Master File-B Record, it shows a "T" (some of the item's this-level costs are inconsistent with its item type) next to the Current and Standard Cost Status fields. My question is what do I have to do the clear this "T" from these fields so that the resulting fields are "blank" (the item's costs are complete)? I look forward to your comments. Regards, Al Gershen ECS Composites Grants Pass, Oregon, USA aldg3@xxxxxxxxxxx Michael G. Ellis Information Systems International, Inc. A Global ERP Consulting Firm 815-398-1670 x23 Choose ISI consultants to ensure consistently top quality implementation services at all levels of your organization. "To enjoy the things we ought and to hate the things we ought has the greatest bearing on excellence of character. " Aristotle, Nichomachean Ethics
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.