× The internal search function is temporarily non-functional. The current search engine is no longer viable and we are researching alternatives.
As a stop gap measure, we are using Google's custom search engine service.
If you know of an easy to use, open source, search engine ... please contact support@midrange.com.




I'm sure you'll get lots of input from folks on the list - but here are several things right off the top of my head.

1. System Parameters (SYS800) - Check for CST being turned ON and review the Inventory and Costing panel for determining what set to use for gl posting and if you are going to cost by facility (this is usually set to YES even if you are not using multiple facilities now for possible future use of multiple facilities).

2. You mention that you may be asked to implement more mfg - which leads me to question whether or not you have BOMs, WCs and Routings presently set up - which should also be set up by facility. If not, you will need to do this in order to perform Cost Roll-Ups. Otherwise all costs would have to be maintained manually thru CST100.

3. For cost roll-up to work for material costs, you need to ensure you have the basis for material costs at the bottom of your BOM entered into CST100 for the set you are rolling. Roll-up then uses this to implode thru the BOM to get materials costs. Also make sure that the bucket you are using for material costs is populated in INV100.

4. Likewise, to get L&OH costs rolled up, you must have WCs with rates (panel 2 of CAP100) and Routings with times.

That's some of the basics.

Use of the various sets and buckets as well as BOM and Routing method codes and their connection and use to cost sets require more detailed explanation. You must also be cautious about Cost load codes and routing basis codes as well as your use of lot size and set up time.

Feel free to contact me off-line at 508-572-9701 for further information.


________________________________

From: bpcs-l-bounces+bnorth=phoenixbcinc.com@xxxxxxxxxxxx on behalf of bpcs-l-request@xxxxxxxxxxxx
Sent: Mon 9/8/2008 1:00 PM
To: bpcs-l@xxxxxxxxxxxx
Subject: BPCS-L Digest, Vol 6, Issue 126



Send BPCS-L mailing list submissions to
bpcs-l@xxxxxxxxxxxx

To subscribe or unsubscribe via the World Wide Web, visit
http://lists.midrange.com/mailman/listinfo/bpcs-l
or, via email, send a message with subject or body 'help' to
bpcs-l-request@xxxxxxxxxxxx

You can reach the person managing the list at
bpcs-l-owner@xxxxxxxxxxxx

When replying, please edit your Subject line so it is more specific
than "Re: Contents of BPCS-L digest..."


*** NOTE: When replying to this digest message, PLEASE remove all text unrelated to your reply and change the subject line so it is meaningful.

Today's Topics:

1. Re: IWI/WCUSA (macwheel99@xxxxxxxxxx)
2. Re: IWI/WCUSA (Kurniaty, Indah)
3. Re: IWI/WCUSA (antwi, isaac a.)
4. Re: IWI/WCUSA (Indah Kurniaty)
5. Re: IWI/WCUSA (Bailey, Dick)
6. Implementing Cost Accounting (Michael Perna)


----------------------------------------------------------------------

message: 1
date: Sun, 7 Sep 2008 15:09:15 -0500
from: macwheel99@xxxxxxxxxx
subject: Re: [BPCS-L] IWI/WCUSA

I am on 405 CD & here it is a weekend other than end-fiscal-month, so we do
various BPCS/400 computer housekeeping chores when the co-worker mob is off
the system like backup, shop order purge, check security log, etc. plus I
have some loose ends not yet completed from last end month, where some weird
totals still to check out.

I have placed on a separate menu, the weekend reorganization functions, in
the sequence in which we run them:

SFC990C
ORD990C
SYS990C
INV971C
INV972C
ACR970C
ACR972C
MRP990C

There are some other reorganization functions we run less often than
weekends, and there are some which can only be run at a particular point in
EOM. For example, immediately after INV900, if we have ample time, are not
doing this over a flakey connection like PC or VPN, and it is not a physical
inventory month,
INV973C
INV970C
If these guys are run at any other time, it is an ungodly mess.

Also this weekend, I shall be running SYS120C. I will do it before the shop
order purge, because I have found by experience that without it, the shop
order purge will take 5 hours, but with it, the purge will take 2 hours.
This SYS120 takes about 3/4 of an hour & is also a big help on end fiscal
tasks going faster.

The precise tasks you use to reorganize your BPCS during times when other
people not on the system, will vary with your BPCS version & which
applications are active.

Al Macintyre
20 year veteran of BPCS
40 year veteran of midrange

Kurniaty, Indah wrote
Hi All,

I'm using BPCS 6.1.00
Does anybody know where IWI/WCUSA comes from ..?
I mean which files/ fields have relation with IWI/WCUSA.

I find that BPCS has a program (INV971) to reset WCUSA.
Is this program really needed to run once in a month ?

Thank in advance.
Regards,
- Indah



------------------------------

message: 2
date: Mon, 8 Sep 2008 15:27:26 +0700
from: "Kurniaty, Indah" <Indah.Kurniaty@xxxxxxxxxxxxxx>
subject: Re: [BPCS-L] IWI/WCUSA

Thanks for Dick Bailey & Borill for the explanation.

Can I ask another question about "On Order" on screen "Material Status
Inquiry"..?
I get amount "On Order" that I don't know where it comes from.

I checked HPO file ( Purchase Order ) and FSO file ( Shop Order ),
but I didn't find any data for this item number.

Are there any files that affect "On Order" besides HPO and FSO ?

Thanks a lot.
- Indah



Important:

The information contained in this email is confidential and may be legally privileged. It is also subject to copyright. If you have received it in error, confidentiality and privilege are not waived and you must not disclose or use the information in it. Please notify the sender by return email and delete it from your system. Any unauthorised use is expressly prohibited.

Please consider the environment before printing this e-mail.


------------------------------

message: 3
date: Mon, 8 Sep 2008 09:17:56 +0000
from: "antwi, isaac a." <iantwi@xxxxxxxxxxxxxxxxxxxxxxx>
subject: Re: [BPCS-L] IWI/WCUSA

Yes there is. Check the IONOD field in IIM

Regards,

Isaac A. Antwi

-----Original Message-----
From: "Kurniaty, Indah" <Indah.Kurniaty@xxxxxxxxxxxxxx>
To: "bpcs-l@xxxxxxxxxxxx" <bpcs-l@xxxxxxxxxxxx>
Sent: 08/09/08 08:35
Subject: Re: [BPCS-L] IWI/WCUSA

Thanks for Dick Bailey & Borill for the explanation.

Can I ask another question about "On Order" on screen "Material Status
Inquiry"..?
I get amount "On Order" that I don't know where it comes from.

I checked HPO file ( Purchase Order ) and FSO file ( Shop Order ),
but I didn't find any data for this item number.

Are there any files that affect "On Order" besides HPO and FSO ?

Thanks a lot.
- Indah



Important:

The information contained in this email is confidential and may be legally privileged. It is also subject to copyright. If you have received it in error, confidentiality and privilege are not waived and you must not disclose or use the information in it. Please notify the sender by return email and delete it from your system. Any unauthorised use is expressly prohibited.

Please consider the environment before printing this e-mail.

--
This is the BPCS ERP System (BPCS-L) mailing list
To post a message email: BPCS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/bpcs-l.

Delivered-To: iantwi@xxxxxxxxxxxxxxxxxxxxxxx


------------------------------

message: 4
date: Mon, 8 Sep 2008 18:34:25 +0700
from: "Indah Kurniaty" <indah.kurniaty@xxxxxxxxx>
subject: Re: [BPCS-L] IWI/WCUSA

Hi Isaac,

Sorry I forgot to mention that I made selection using Facility. So I
think On Order can't be get from IIM/IONOD. Are there any files ..?

Thanks.

On 9/8/08, antwi, isaac a. <iantwi@xxxxxxxxxxxxxxxxxxxxxxx> wrote:
Yes there is. Check the IONOD field in IIM

Regards,

Isaac A. Antwi



------------------------------

message: 5
date: Mon, 8 Sep 2008 08:30:45 -0500
from: "Bailey, Dick" <Dick.Bailey@xxxxxxxx>
subject: Re: [BPCS-L] IWI/WCUSA

On Order in the INV300 inquiry screen is a global number, so it DOES come from IONOD in the Item Master, and may not display the number you want.

Also, if you are using Resupply Customer orders, these also show up as part of the displayed number, being on order for the ordering facility, in addition to open purchase orders.

Dick Bailey
MCFA,Inc.

-----Original Message-----
From: bpcs-l-bounces+dick.bailey=mcfa.com@xxxxxxxxxxxx [mailto:bpcs-l-bounces+dick.bailey=mcfa.com@xxxxxxxxxxxx] On Behalf Of Indah Kurniaty
Sent: Monday, September 08, 2008 6:34 AM
To: BPCS ERP System
Subject: Re: [BPCS-L] IWI/WCUSA

Hi Isaac,

Sorry I forgot to mention that I made selection using Facility. So I
think On Order can't be get from IIM/IONOD. Are there any files ..?

Thanks.

On 9/8/08, antwi, isaac a. <iantwi@xxxxxxxxxxxxxxxxxxxxxxx> wrote:
Yes there is. Check the IONOD field in IIM

Regards,

Isaac A. Antwi

--
This is the BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l.

Delivered-To: Dick.Bailey@xxxxxxxx


------------------------------

message: 6
date: Mon, 8 Sep 2008 08:23:46 -0700
from: "Michael Perna" <MPerna@xxxxxxxxxxxx>
subject: [BPCS-L] Implementing Cost Accounting

We are currently running on V4.03 and I have been asked to implement the
Cost Account function of BPCS. We currently have most of the modules
installed, but not necessarily using them to their full potential. Does
any one have any recommendations as to the best approach to implement
costing? Basically, we want to use a standard labor and overhead cost
for the entire year, plus actual material costs.



Are all the set ups necessary in BPCS to do this? I was told, going
forward, we will implement more and more of BPCS manufacturing, but not
right now. I know I can plow through the run manual for Costing, but
I'm hoping I can get some quick input from the community.

Thanks in advance -

Michael Perna

Business Systems Analyst - Finance

t. 310.832.8000 | f. 310.519.2605
P.O. Box 1950 | San Pedro, CA 90733 | USA, Earth
contessa.com <http://www.contessa.com/>










------------------------------

--
This is the BPCS ERP System (BPCS-L) digest list
To post a message email: BPCS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/bpcs-l.



End of BPCS-L Digest, Vol 6, Issue 126
**************************************



As an Amazon Associate we earn from qualifying purchases.

This thread ...


Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.