× The internal search function is temporarily non-functional. The current search engine is no longer viable and we are researching alternatives.
As a stop gap measure, we are using Google's custom search engine service.
If you know of an easy to use, open source, search engine ... please contact support@midrange.com.



Try this:
Hi Chick Doe


1- Create two operations in the routing of the item processed outside, both
being flagged as outside operations
2- create a BOM, if you have not already done so, for the plated item. The
component of the BOM is the item before plating. Obviously, the item before
and after plating is not the same, hence you need 2 different item numbers.
3- create a shop order for the item to be processed outside. 
4- create a Po with same item (plated item) on two different lines, each PO
line linked with their respective shop order outside operations. On the PO
line linked with the fixed setup operation cost, make the PO unit cost equal
to the total charge divided by the qty ordered, ( $1.33 in your example) so
that the total extended cost is equal to the fixed cost ($1.33 x 150 =
$200.). The other PO line is $1.00 each.
5- create an inventory transaction for the outside operation receipt: affect
cost but do not affect item level inventory balance
6- receive both lines of the PO with the inventory transaction created in
step 5-
7- receive the shop order with a regular R transaction, or an M transaction,
etc. This will put update the inventory quantities on hand 
8- enter the supplier's detailed invoice against each respective line of the
PO.


I have not tried this setup, but I believe the item's actual cost ( from
actual invoice sent by the supplier) will be updated correctly.

Regards,

> Daniel Warthold
Business Analyst
> Eicon Networks Corporation            
>                                       
> 9800 Cavendish blvd                   
> Montreal (Quebec)                     
> Canada H4M 2V9                        
>                                       
> Tel:   (514) 832-3839                 
> Fax: (514) 745-5588
> Email: daniel.warthold@xxxxxxxxx      
> 



-----Original Message-----
From: Chick Doe [mailto:Cdoe@xxxxxxxxxxxxxxxxxxxxx]
Sent: Monday, November 29, 2004 13:46
To: bpcs-l@xxxxxxxxxxxx
Subject: [BPCS-L] minimum lot charges for PO's



version 6.1

how do you generate a po for an inventory item where a minimum lot
charge applies? for example let's say we're going to send out 150 parts
to be plated and the op cost in the routing is $1.00 each. if we write
to PO it comes out for a total PO  cost of $150. 

but suppose the vendor charges a minimum of $200 to heat the plating
tank. he is going to charge us $200 to do the 150 parts. how do i
reflect this on the po so that the vendor sees it and so that the a/p
people see it?
_______________________________________________
This is the SSA's BPCS ERP System (BPCS-L) mailing list
To post a message email: BPCS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/bpcs-l.

Delivered-To: daniel.warthold@xxxxxxxxx

As an Amazon Associate we earn from qualifying purchases.

This thread ...


Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.