|
Jeff, You can either change exiting job queues with the chgjobq command and set the maximum number of jobs parameter to 1, or create a new jobque with a maximum number of jobs parameter set to 1 and add the new job queue to the batch subsystem with the addjobqe command. Wayne Boekenkamp REALTime Data Collection Solutions, Inc. a Subsidiary of RealTime Technologies, Inc. Phone: (484) 875-9411 Fax: (484) 875-9461 Cell: (610) 751-8211 -----Original Message----- From: bpcs-l-admin@midrange.com [mailto:bpcs-l-admin@midrange.com]On Behalf Of Jeff Young Sent: Wednesday, September 18, 2002 11:07 AM To: bpcs-l@midrange.com Subject: Single thread jobs I need to single thread batch jobs ... how can I insure this ... _______________________________________________ This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@midrange.com To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/cgi-bin/listinfo/bpcs-l or email: BPCS-L-request@midrange.com Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.