|
for a point of reference we run about 30 5250 emulation sessions at a remote site using a 256KB frame relay circuit. the response time for this is fine. in my opinion 5250 emulation does not take a lot of bandwidth. however, other applications, such as access or excel running on a PC using ODBC do take longer! chick doe barton instrument systems >>> eric-tam@mvphk.com 07/23/02 01:31AM >>> Dear all, We're on v.6.1 MM. We are in the process of upgrading the leased line between the AS/400 and a remote site. Are there any figures from any parties, say SSA, telling the required bandwidth for each 5250 emulation session and clien/server session conecting to BPCS? Regards, Eric Tam _______________________________________________ This is the SSA's BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L@midrange.com To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/cgi-bin/listinfo/bpcs-l or email: BPCS-L-request@midrange.com Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.