Ping

Thanks for keeping us informed on your version with each post question.

Are you saying that both regular & alternate operations are concurrently
active & BPCS order release selects on the basis of which work center is not
yet over capacity?  That sounds so cool.  I never heard of any such thing.
Perhaps someone can tell me if that is available to BPCS 405 CD.

Our situation is that we don't much worry about capacity, it is material lead
times & setup times that are the killers.  We have some parts in which the
efficient way to make the product is order size dependent, due to the role of
setup time.  At time of release of shop order from MRP250 information, we
need our production manager to be able to decide which method makes sense.

Method codes can be used, if the part has been setup to support both methods
concurrently.  We are not using this heavily as yet.  I think we need to
figure out how to make notes visible on MRP250 so that the production manager
sees that some quantity required is close to, or has crossed thresh hold,
such that the other method is indicated as wise to consider, but not show the
notes when other method threshhold not in the picture.

MacWheel99@aol.com (Alister Wm Macintyre) (Al Mac)

> From: fupingren@yeah.net (Ren Fu Ping)

>  Dear All,
>
>          We are on As/400,BPCS version V6.1.01.
>
>         AS all know, BPCS allow user to define active operation 10 (belong
to
> work centre 101) and alternate operation 20 (Belong to Work centre 102) in
> SFC100. But Problem is that if two different items have the same active
> operation 10 (W.C. 101) and alternate operation 20 (W.C. 102) , also have
> sequence number, that is to say, Work centre 101 is shared by two items,
and
> Work centre 102 is shared by the same two items alternately. and if work
> centre 101 loading  CAP computed by bpcs is over normal capacity, IS BPCS
> system automatical tranfered work center 101 loading to work centre 102
> loading?  if can't, then how to deal with such things?
>
>        thanks ervery one for any help.

>  Ping
>
>  China



As an Amazon Associate we earn from qualifying purchases.

This thread ...

Follow-Ups:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.