|
Hi all, we need to use alternative items in BOM - e.g. there are 2 allmost the same bearings, each of them can be used in product on the same position, and we use that one, which is on the stock. Our BOM is authorized by customer, we can maintain list of material in SFC500, and then we could see in history, what was issued. I don't like very much idea of using material methods in BOM, now we have only one BOM per product. Our BOM is rather complicated - up to 8 level. Any ideas? TIA oTTo --- Odchozí zpráva neobsahuje viry. Zkontrolováno antivirovým systémem AVG (http://www.grisoft.cz). Verze: 6.0.191 / Virová báze: 91 - datum vydání: 11.9.2000
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2025 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.