|
This response relates to the e-mail sent by Al Macintyre regarding the G/L Journal Posting problems experienced with 405 CD V4R3 mixed mode and the first end-month fiscal for year 00. ********************************************** Al: There have been several excellent responses to your e-mail questions. Here are a few additional suggestions, some of which relate specifically to your V405 CD environment: 1. To make tracking of the Journal Batches that correspond to your Inventory Transactions easier, you should consider using a unique Journal Source Code for each Transaction Effect Code that posts to G/L. You might want to use the Transaction Code itself as the Journal Source Code in order to have a more direct association. Just be sure that you do NOT duplicate an existing BPCS reserved Journal Source from other application areas (e.g. BL, AR, AP, etc.). This method will also reduce the number of Batch Numbers used with a single Journal Source Code (i.e. within IN). 2. In order to reduce the number of Journal Batches that BPCS creates, you may want to remove the Location (TLOCT) as one of the Level Breaks that forces an increment of the Journal Batch Number in INV920. Please refer to the OPNQRYF statement for ITH in INV920C. The Warehouse (TWHS) controls the Company and the Location (TLOCT) controls the G/L Profit Center which is retrieved from the Location (ILM) File. However, there is NO need to create a new Batch Number each time that the Location (i.e. P/C) changes. A Journal Batch can have multiple P/C's within it. In addition to removing the TLOCT from the OPNQRYF statement, you would also need to remove the statement in INV920 that sets CNTLVL to "Y" if the Location changes. Combined with Point 1, this method will produce one Journal Batch per Transaction Code per day, assuming that you do NOT run INV920 multiple times in a day. 3. You mentioned that there were small batches of Journal Transactions that could NOT post because they already had a GJH entry for them. This condition could occur if you happen to run Subsystem Post (GLD540) at the same time that INV920 (or any other program that writes records to GJW) is running. GLD540 will pick up the transactions in GJW and begin the post process to GJH/GJD. However, the other program(s) are still adding transactions to GJW with the same Batch Number. These additional transactions will NOT be processed until you run GLD540 again. As a result, when GLD540 is run again, the Batch Number will already be in existence and the GJW records will NOT post. Be sure to carefully control when GLD540 is run. Please feel free to contact me directly if you have any further questions about my suggestions. Hope that this helps. Les Mittman, CPIM BSI Consulting, Inc. Highland Park, IL (847) 831-9388 (847) 831-9389 (fax) +--- | This is the BPCS Users Mailing List! | To submit a new message, send your mail to BPCS-L@midrange.com. | To subscribe to this list send email to BPCS-L-SUB@midrange.com. | To unsubscribe from this list send email to BPCS-L-UNSUB@midrange.com. | Questions should be directed to the list owner: dasmussen@aol.com +---
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.