Mon, this is from S21 Style Production Definition Management v3.5.2 Product
Guide
I hope it helps.
Production Lead Time
The amount of manufacturing time required to produce an item from its
immediate
materials and operations. No reference is made to the lead time of its
materials.
Cumulative Lead Time
The amount of time required to produce an item from scratch. It is based on
a full
explosion of the bills of material of the item and its sub-assemblies and
includes the
purchasing lead time of raw materials.
Lead Time
The amount of time required to produce or procure a style or material. For
production items, lead time is derived from the sum of the lead times of the
individual
operations required to produce the item and any sub-assemblies. Lead time
also
relates to procurement times for purchased items. See also Production and
Cumulative Lead Times.
Jan Mazereeuw
Mountain Equipment Coop
www.mec.ca
604.707.3390
-------- Original Message --------
Subject: [SYSTEM21] Production LT
From: "Mon M. Ferriols - IT Mgr" <mon.ferriols@xxxxxxxxxxxxxx>
Date: Wed, May 23, 2007 1:15 am
To: <system21@xxxxxxxxxxxx>
Dear all:
How does the production LT in 3/MDM work?
Mon M. Ferriols
Information Technology Department
Ionics EMS, Inc.
* (49) 543-0552 (Plant 5/6)
* mon.ferriols@xxxxxxxxxxxxxx
* www.ionicsgroup.com <
http://www.ionicsgroup.com/>
_______________________________________________
This is the System 21 Users (SYSTEM21) mailing list
To post a message email: SYSTEM21@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit:
http://lists.midrange.com/mailman/listinfo/system21
or email: SYSTEM21-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at
http://archive.midrange.com/system21.
As an Amazon Associate we earn from qualifying purchases.