|
Lim -
I agree with Eric - you should probably change the backup program to use
ENDJOB OPTION(*CNTRLD) with DELAY(xx), followed by a DLYJOB(xx) with a
long
enough interval to allow the never-ending program to cycle through its
logic.
At either the top or the bottom of the processing logic in the program
check
%SHTDN or use the SHTDN opcode to check for whether the subsystem, system,
or endjob was requested, then perform and orderly shutdown of the
program...
- sjl
Lim wrote:
This job is a never ending job and it is running on a subsystem that get
ends (ENDSBS), with option(*immed), during system backup.
My guess is that it was in the process of connecting to a mysql server
and
the server ip is wrong or sever was downed at that time. hhhmm.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.