No, for equipment with cable mgt arms I order cables to accommodate them.
From: Rob Berendt<mailto:rob@xxxxxxxxx>
Sent: Wednesday, January 4, 2023 1:32 PM
To: Midrange Systems Technical Discussion<mailto:midrange-l@xxxxxxxxxxxxxxxxxx>
Subject: RE: Power 10 maintenance
So basically you unplug them if you slide them out for maintenance?
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1
Group Dekko
Dept 1600
Mail to: 7310 Innovation Blvd, Suite 104
Ft. Wayne, IN 46818
Ship to: 7310 Innovation Blvd, Dock 9C
Ft. Wayne, IN 46818
https://na01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.dekko.com%2F&data=05%7C01%7C%7Cb84818130e054ffdd8a808daee8206ac%7C84df9e7fe9f640afb435aaaaaaaaaaaa%7C1%7C0%7C638084539469203718%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=AHGA2XFbD72v1Nvt4gkfYLGqd1KSqcr17aoipLCn0w8%3D&reserved=0
-----Original Message-----
From: MIDRANGE-L <midrange-l-bounces@xxxxxxxxxxxxxxxxxx> On Behalf Of Steve Pavlichek
Sent: Wednesday, January 4, 2023 1:29 PM
To: Midrange Systems Technical Discussion <midrange-l@xxxxxxxxxxxxxxxxxx>
Subject: RE: Power 10 maintenance
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
I typically order short power cables for all of my customer installs. Two colors to differentiate power source. I also order fiber cables via 3rd party in different length so there is not a bunch of loops in the rack.
I spoke with the POWER product manager at a conference a few years ago about the power cords and he gave me some BS answer that the engineering cost was to high to certify different length power cords.
From: Rob Berendt<mailto:rob@xxxxxxxxx>
Sent: Wednesday, January 4, 2023 1:05 PM
To: midrange400 midrange400 midrange400<mailto:midrange-l@xxxxxxxxxxxxxxxxxx>
Subject: Power 10 maintenance
I'm getting in:
S1014(9105-41B)
w/EMXO expansion unit
S1024(9105-42A)
Two 8969-F24
FS7300.
My question is, since I'm tired of power cables stretching all over the place looking like cobwebs do I order short 2-3' cables just long enough to reach the PDU's,
or do I use power cables long enough to stay plugged in while you slide the units out for maintenance?
Summary: Are the parts hot swappable?
BP ordered internal NVMe drives for VIOS.
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1
Group Dekko
Dept 1600
Mail to: 7310 Innovation Blvd, Suite 104
Ft. Wayne, IN 46818
Ship to: 7310 Innovation Blvd, Dock 9C
--
As an Amazon Associate we earn from qualifying purchases.