× The internal search function is temporarily non-functional. The current search engine is no longer viable and we are researching alternatives.
As a stop gap measure, we are using Google's custom search engine service.
If you know of an easy to use, open source, search engine ... please contact support@midrange.com.



I have a P8 box with one 4 port NIC with two ports on each NIC going to two
different switches.



Each port has its own IP and then we use VIP to present only one external
IP. This is a legacy design, the goal being to handle port failures on the
switches but of course, the weak link is now the NIC.



I do have a a second NIC installed so could I have one port on NIC 1 go to
a port on switch 1 and one port on NIC 2 go to a port on switch 2 and so
handle both a switch failure as well as a NIC failure?



Doing some reading it seems (we run 7.3) it seems I could look at ethernet
link aggregation as per this link



https://www.ibm.com/docs/en/i/7.3?topic=ethernet-link-aggregation



but it’s not clear if that would work if there are two different switches
involved.



Alternatively could we just define the two lines for the two switch
connections with each having their own IP addresses, and then just VIP to
present one IP to the host? Then potentially if one NIC (or one switch
port) fails, then the second NIC is still running.


That should mean no need to do any switch configuration like Virtual LInk
Aggregation or stacking (I think). Problem is our network guys know the
switches but are used to Windows or Linux boxes connected to them, not
intelligent boxes like Power servers with their enhanced networking
capabilities

As an Amazon Associate we earn from qualifying purchases.

This thread ...

Follow-Ups:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.