Every other Tuesday various group PTFs are released.
8/31 will be next.
9/14
9/28
etc
I've found if I order after 3PM EDT, they are all ready.
I run the below from an AJS job, runs every other Tuesday, automatically.
10 SNDPTFORD PTFID((SF99731 *ONLYPRD *ONLYRLS)) DELIVERY(*LINKONLY) DLVRYFMT(*SAVF) ORDER(*REQUIRED) REORDER(*NO) CHKPTF(*YES) IMGOPT(*DOWNLOAD)
20 OVRPRTF FILE(QPDSPLOG) HOLD(*NO) SAVE(*YES)
30 DSPLOG OUTPUT(*PRINT) MSGID(CPI35E9 CPI35E8)
40 OVRPRTF FILE(QSYSPRT) HOLD(*NO) SAVE(*YES) USRDTA(PTFCOVER)
50 DSPPTFCVR SELECT(*NOTAPY) OUTPUT(*PRINT)
Paul
-----Original Message-----
From: MIDRANGE-L <midrange-l-bounces@xxxxxxxxxxxxxxxxxx> On Behalf Of Rob Berendt
Sent: Thursday, August 26, 2021 4:17 PM
To: Midrange Systems Technical Discussion <midrange-l@xxxxxxxxxxxxxxxxxx>
Subject: TR "enabler" ptf's are available.
________________________________
CAUTION: This email originated from outside of the PENCOR network. Do not click on any links or open attachments unless the sender is known, and the content is verified as safe.
________________________________
Keep in mind that the "enabler" ptf's are not the actual TR but just a ptf to enable the next TR.
All links to the announcements and predictions are below.
The next cumulative package is scheduled for 24 Sep 2021.
MF99305 7.4 TR5 "enabler" ptf is available
MF99211 7.3 TR11 "enabler" ptf is available Enablers often come out about 4 months prior to the actual TR.
Next two 7.4 DB2 group ptfs:
15: 9/10/2021
16: 11/12/2021
History of Fall TR's:
7.4 TR3: 11/13/2020
7.4 TR1: 11/15/2019
7.3 TR9: 11/13/2020
7.3 TR7: 11/15/2019
COMMON POWERUp October 4-7
https://www.ibm.com/support/pages/730-current-cumulative-ptf-package
https://www.ibm.com/support/pages/740-current-cumulative-ptf-package
https://www.ibm.com/support/pages/ptf/MF99305
https://www.ibm.com/support/pages/ptf/MF99211
https://www.ibm.com/support/pages/node/6408996
https://www.ibm.com/support/pages/ibm-i-technology-refresh-information-ibm-i-74
https://www.ibm.com/support/pages/node/687365
https://www.common.org/powerup21/home
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1 Group Dekko Dept 1600 Mail to: 7310 Innovation Blvd, Suite 104
Ft. Wayne, IN 46818
Ship to: 7310 Innovation Blvd, Dock 9C
Ft. Wayne, IN 46818
http://www.dekko.com
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list To post a message email: MIDRANGE-L@xxxxxxxxxxxxxxxxxx To subscribe, unsubscribe, or change list options,
visit:
https://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxxxxxxxx
Before posting, please take a moment to review the archives at
https://archive.midrange.com/midrange-l.
Please contact support@xxxxxxxxxxxxxxxxxxxx for any subscription related questions.
Help support midrange.com by shopping at amazon.com with our affiliate link:
https://amazon.midrange.com
As an Amazon Associate we earn from qualifying purchases.