|
It's been my experience that once the power is out changing QUPSDLYTIM is
futile. It is only checked it at power failure time and starts the
countdown. The only way to interrupt the countdown is to restore power.
From the help:
A change to this system value takes effect the next time there is a
power failure. The shipped value is 200 seconds.
The keyword being "NEXT".
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1
Group Dekko
Dept 1600
Mail to: 2505 Dekko Drive
Garrett, IN 46738
Ship to: Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
From: Roberto José Etcheverry Romero <yggdrasil.raiker@xxxxxxxxx>
To: Midrange Systems Technical Discussion <midrange-l@xxxxxxxxxxxx>
Date: 04/24/2015 11:48 AM
Subject: Re: UPS handling
Sent by: "MIDRANGE-L" <midrange-l-bounces@xxxxxxxxxxxx>
If your UPS are the good network managed kind you can get a program that
talks to them and therefore gets the real remaining battery time from
them.
based on that you can then shutdown whatever you want.
You may combine the serial alert with the network one or use them for
everything. Of course, when down to restricted state you can't have
anything so i don't know if there is a way to override the QUPSDLYTIM...
or
maybe have a program that when going down to restricted sets the time and
when starting subsystems it sets it back to *nolimit?
I also have 90+ UPS (only 1 but still...) and i end up shutting down
everything manually...
On Fri, Apr 24, 2015 at 12:22 PM, <rob@xxxxxxxxx> wrote:
I plan on using QUPSDLYTIM and QUPSMSGQ to do some sort of cleanshutdown.
message
Our UPS lasts a really long time, like 90 minutes or more.
I thought of using *NOMAX for QUPSDLYTIM but I have an issue with that.
One, if you brought your system down to restricted state and then the
power failure hits it kills the system right then and there if the
queue specified in QUPSMSGQ is not locked by a job.anyway.
Two, if the shutdown program 'hangs' then your system does no orderly
shutdown.
But if I make that value too small then my program may not be done
But with 90+ minutes I can make it pretty substantial.list
Any thoughts on this?
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1
Group Dekko
Dept 1600
Mail to: 2505 Dekko Drive
Garrett, IN 46738
Ship to: Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing
To post a message email: MIDRANGE-L@xxxxxxxxxxxx--
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing
list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.