|
Congratulations. QMNSAVE is not for the faint of heart. You will likely find that this will change from release to release. Take a look at: http://www.taatool.com/document/L_save2.htm It will do what you want, and be more flexible. Al - in Tampa on the way home. Al Barsa, Jr. Barsa Consulting Group, LLC 400>390 "i" comes before "p", "x" and "z" e gads Our system's had more names than Elizabeth Taylor! 914-251-1234 914-251-9406 fax http://www.barsaconsulting.com http://www.taatool.com http://www.as400connection.com "MITTELHEISSER Jean Claude" <mitteljc@xxxxxxx To > "Midrange Systems Technical Sent by: Discussion" midrange-l-bounce <midrange-l@xxxxxxxxxxxx> s@xxxxxxxxxxxx cc Subject 02/10/2005 09:18 Solution : RE: GO SAVE 21 and V5R3 AM Please respond to Midrange Systems Technical Discussion <midrange-l@midra nge.com> Hi, I'll answer myself to my question : I've finally found a way to write a CL which ends all subsystems, uses QMNSAVE to save the whole system on tape and makes an IPL. IPL can be replaced by a restart of the subsystems. It seems to work very well. It has only to be started in QCTL. What's a little bit frightening is that console is not available while saving. But with the new parameter BCHTIMLMT of ENDSBS we are sure that system restarts. The revolution is that a "GO SAVE 21" equivalent program can be scheduled in V5R3. If someone is interested, I can share this CL. Regards. -----Message d'origine----- De : midrange-l-bounces@xxxxxxxxxxxx [mailto:midrange-l-bounces@xxxxxxxxxxxx]De la part de MITTELHEISSER Jean Claude Envoyé : lundi 7 février 2005 13:00 À : Midrange Systems Technical Discussion Objet : GO SAVE 21 and V5R3 Hi, I've heard many things about new possibilities of V5R3 in saving domain : - SAVSYS is now possible in batch. - A subsystem can stay active after ENDSBS *ALL. - ... Are there other problems that could prevent us from making scheduled full system backup without using BRMS ? I've searched everywhere I could and I didn't find any example of how to do that, if it is possible. I know about the programs to use, QMNSAVE and QMNSRBND, and their parameters. But can we use them simply in a CL started by the job scheduler, perhaps in a special subsystem ? Thanks. -- This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list To post a message email: MIDRANGE-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/midrange-l or email: MIDRANGE-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/midrange-l. -- This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list To post a message email: MIDRANGE-L@xxxxxxxxxxxx To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/midrange-l or email: MIDRANGE-L-request@xxxxxxxxxxxx Before posting, please take a moment to review the archives at http://archive.midrange.com/midrange-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.