Orville,
I think you can accomplish your goal with the ars planning grid. I have not done it...but i can send you a contact that is knowledgeable...if you want.
Chuck Mick
(Sent from my phone...sorry for being brief.)
Â
Confidential: This electronic message and all contents or attachments contain information from Diversified Machine, Inc. which may be privileged, confidential or otherwise protected from disclosure. The information is intended to be for the addressee only. If you are not the addressee, or have received this message in error, any disclosure, copy, distribution or use of the contents of this message is prohibited. If you have received this electronic message in error, please notify us immediately (248-277-4311) and destroy the original message and all copies.ÂThank you for your assistance in this matter.
Â
** Please consider the environment before printing this e-mail **
Â
-----Original Message-----
From: Orville_Meredith@xxxxxxxxxxxxx <Orville_Meredith@xxxxxxxxxxxxx>
Sent: Tuesday, October 26, 2010 9:09 PM
To: MAPICS ERP System Discussion <mapics-l@xxxxxxxxxxxx>
Subject: Re: [MAPICS-L] Need help with MRP (daily productionload requirements)
Dale,
Thank You.
Orville Meredith
Systems Analyst
Gecom Corporation
1025 Barachel Lane
Greensburg, IN 47240
orville_meredith@xxxxxxxxxxxxx
812-663-1745 (T)
812-663-2230 (F)
812-718-9028 (C)
(Travel, after 4:00 p.m. weekdays, and weekends ONLY)
Dale
Gindlesperger
<dale_gindlesperg To
er@xxxxxxxxx> MAPICS ERP System Discussion
Sent by: <mapics-l@xxxxxxxxxxxx>
mapics-l-bounces@ cc
midrange.com
Subject
Re: [MAPICS-L] Need help with MRP
10/26/2010 02:05 (daily production load
PM requirements)
Please respond to
MAPICS ERP System
Discussion
<mapics-l@midrang
e.com>
Orville,
I did this for a prior employer - not integrating AutoRelease, but a daily
scheduling application that I used to simulate an advanced planning
solution (I
didn't have the budget to acquire AVP). How I did it was to take the
output
from the daily scheduling application, clear all firm planned orders from
MPSP
for the planner designated for the end items, and programmatically create
firm
planned orders for each day's scheduled production. This was done
immediately
prior to our weekly (or more frequent as required) MPSP/MRP process.
Since we generally built to a planned overall schedule for a total number
of
units, this worked well for us. It wasn't an ideal solution, but was quite
effective for us while we were producing that product line. It basically
gave
us the benefit of maintaining a somewhat flexible daily production schedule
and
also gave us the benefits of planning all components in MRP (we produced
between
80-90% of the components in house). In other words, we integrated a demand
planning process at the top end, with a batch ordering process at the lower
levels.
It actually wasn't that difficult to do. However, having said that, it
only
worked for us because we were able to maintain a steady level of production
at
the top level/end item level, and there was a fairly high percentage of
common
components for that product.
I had intended to extend that process to other areas of the company, but
the
company decided to abandon that product line before I was able to do so.
Dale (Cork) Gindlesperger, CPIM
________________________________
From: "Orville_Meredith@xxxxxxxxxxxxx" <Orville_Meredith@xxxxxxxxxxxxx>
To: mapics-l@xxxxxxxxxxxx
Sent: Mon, October 25, 2010 3:31:07 PM
Subject: [MAPICS-L] Need help with MRP
Hello,
I have two Infor packages. One is AutoRelease (for EDI) and the other is
XA 7.7. What I am trying to do is split the weekly (from AutoRelease)
buckets into daily buckets in MRP. Looked through the manuals and they
were not any help.
Has someone else been able to do this within XA?
Orville Meredith
Systems Analyst
Gecom Corporation
1025 Barachel Lane
Greensburg, IN 47240
orville_meredith@xxxxxxxxxxxxx
812-663-1745 (T)
812-663-2230 (F)
812-718-9028 (C)
(Travel, after 4:00 p.m. weekdays, and weekends ONLY)
== This message has been scanned for viruses ==
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit:
http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at
http://archive.midrange.com/mapics-l.
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit:
http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at
http://archive.midrange.com/mapics-l.
As an Amazon Associate we earn from qualifying purchases.