We do a lot of overriding of facilities during our manufacturing order process. Is anybody else doing this?
Per #5 how are you capturing those averages, and updating the routing files?
-Tom Stieger
Engineer
California Fine Wire
-----Original Message-----
From: mapics-l-bounces@xxxxxxxxxxxx [mailto:mapics-l-bounces@xxxxxxxxxxxx] On Behalf Of Joe Perrault
Sent: Friday, March 06, 2009 8:29 AM
To: MAPICS ERP System Discussion
Subject: Re: [MAPICS-L] PCC reporting - run labor hours per machine
From the knowledgebase:
This can be caused by any of the following:
1) The last Order Close and Purge in IM may have said NO to Update routing averages. If that happened, no averages would have changed.
2) The manufacturing order was force closed and the operation in question was at a status 10, 20, or 30. Only status 40 operations update averages in the PDM file. If the order had a status of 50 or 55, the operation would be at a status 40 and would have updated the average in the ROUTNG file, unless 3) is true.
3) If the operation is at a status 40, but the qty reported complete is 0.0, MAPICS could not convert the actual time back to the unit TBC times in the routing file, so did not update the averages.
4) Someone has changed the TBC factor in the standard routing in PDM since the last order close and purge. Changing the TBC factor will zero the routing averages and set the NOTIM (number of times the averages have been updated) field to zero.
5) Average run times are updated only when the actual work center for the operation in the MOROUT file is the same as the standard work center defined in the ROUTNG file. If a work center override was entered during shop activity update, averages in the standard routing are not updated.
Joe Perrault
-----Original Message-----
From: mapics-l-bounces@xxxxxxxxxxxx
[mailto:mapics-l-bounces@xxxxxxxxxxxx] On Behalf Of Ioffe, Jane [BUL/LAK]
Sent: Friday, March 06, 2009 10:04 AM
To: MAPICS ERP System Discussion
Subject: Re: [MAPICS-L] PCC reporting - run labor hours per machine
For some reason it's not updated in our ROUTNG. Is there a set up we should've done?
Thank you and Regards,
Jane Ioffe
847-295-4593
-----Original Message-----
From: mapics-l-bounces@xxxxxxxxxxxx
[mailto:mapics-l-bounces@xxxxxxxxxxxx] On Behalf Of Joe Perrault
Sent: Friday, March 06, 2009 8:57 AM
To: MAPICS ERP System Discussion
Subject: Re: [MAPICS-L] PCC reporting - run labor hours per machine
There is a running average calculated and stored in the ROUTNG file for
each operation.
Joe Perrault
-----Original Message-----
From: mapics-l-bounces@xxxxxxxxxxxx
[mailto:mapics-l-bounces@xxxxxxxxxxxx] On Behalf Of Ioffe, Jane
[BUL/LAK]
Sent: Friday, March 06, 2009 8:48 AM
To: mapics-l@xxxxxxxxxxxx
Subject: [MAPICS-L] PCC reporting - run labor hours per machine
Hello All,
I wonder if anybody knows if there is a report available in PCC or PMC
to calculate average hours spent for building any finished good item.
It could be using a range criteria for an item or completion date.
We are at R5.5 , but would think it should be a pretty basic function
of any manufactured shop.
I imagine it could be done separately, in Query or any reporting tool,
using MOHRTG and MOHMST with calculation of total hours spent per
operation divided by total qty completed this period, but still curious
if anybody else needed that in their workshop.
Thank you in advance,
Jane Ioffe
Applications System Analyst
Buehler LTD
41 Waukeegan Rd. Lake Bluff, IL 60044
(847) 295-4593
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit:
http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at
http://archive.midrange.com/mapics-l.
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit:
http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at
http://archive.midrange.com/mapics-l.
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit:
http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at
http://archive.midrange.com/mapics-l.
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit:
http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at
http://archive.midrange.com/mapics-l.
As an Amazon Associate we earn from qualifying purchases.