|
We are looking for a solution to a problem. What we would like to happen, is almost accomplished with a flow type milestone, however we have found it to have some issues. We have several facilities that run two types of work, sometimes they are scheduled to run single operation batch type parts usually with one operator per facility, and sometime they are running different operations on the same part in a one-piece flow with a single operator running all. Our issue is with the flow type work, we want to track actual labor time, machine time, not back flush either, and only have the operator log to the last operation to reduce the number of transactions. Also while scheduling the Facilities we would like to overlap them in the schedule so they show being used in the same time bucket. Typically the run quantities on the flow type MO's vary quite a bit so we found the use of queue time or move time to offset the facility run hours not an option. So if anyone has a creative solution were all ears. Thank-you in advance. Terry Terry Moffitt Mfg. Engineer <http://www.altek-inc.com/> www.altek-inc.com INNOVATIVE MANUFACTURING SOLUTIONS
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.