×
The internal search function is temporarily non-functional. The current search engine is no longer viable and we are researching alternatives.
As a stop gap measure, we are using Google's custom search engine service.
If you know of an easy to use, open source, search engine ... please contact support@midrange.com.
What I use:
I created a software "package" that runs every weekend to update files (that
we added) with data copied from BPCS, into Relational Data Base Compliant
format to show:
What raw materials are used, that we get from what vendors, on what end
items, that were when last sold, that go to what customers, what quantity
needed (BOM levels multiplied), and how many standard labor hours to make
each end item (disregarding setup move scrap math), with other related
information.
Developing this package, and validating the results, took a while.
This package's results get used for:
Commodity Content (costs fluctuate worse than gasoline) within latest
purchases, receipts, and sales by customer item, sales person, etc.
Raw materials needed by customers for which there is contract pricing that
our customer negotiated with our vendor (multiply BOM needed times sales
quantities to get raw needed by contract)
How much raw materials do we have in stock that is exclusively used by
certain customers
Hazardous content analysis
When we have vendor price increases, what end customer items need to be
requoted
Other applications
The package was originally developed for one purpose. Over the years MANY
additional purposes have latched onto utilizing its results.
I also run this package regeneration & standard cost rollup & some other
stuff on the Thursday nite before an end fiscal month, because come Friday
nite there are sometimes upper managers who want the results NOW, soon after
people get done for Friday, so I am making sure the results are accurate to
all but the last day's engineering changes.
We have what we call TRUE MATERIAL COST set.
This is a copy of ACTUAL for rollup purposes, so that we can see how actual
purchase cost changes impact the bottom line, without waiting on shop
production trickle up to get there.
I have established what I call "Excel friendly" standards, which I include
as a /COPY reminder check list in all programs that are supposed to be
creating 400 reports that ultimately will end up in Excel format.
This is because other standards are used on most other programs.
I get most of these reports to Excel via OPSNAV then the Microsoft "Wizard",
then manually clean up the results.
What I use is dictated by:
We are on 405CD on one of the last AS/400 ever made (model 170).
We have pretty much native 400 tools as they existed 20 years ago.
Other people than me run the network stuff, which crashes every few months,
and when repaired, I usually do not get back stuff that was there before.
I run all the End Fiscal Stuff in my name, need to keep from years ago, so
the number of reports in my name are in the thousands, many with tens of
thousands of pages (10% of our disk space is end fiscal reports without
capability of backing that up), so OPSNAV is exceedingly slow.
-
Al Mac
Happy I remain this functional: Wake up each morning; roll out of bed; feet
touch floor; I can stand up (sometimes need to push with arms); walk; get to
toilet; all familiar systems do their thing.
-----Original Message-----
From: bpcs-l-bounces+macwheel99=wowway.com@xxxxxxxxxxxx
[mailto:bpcs-l-bounces+macwheel99=wowway.com@xxxxxxxxxxxx] On Behalf Of
Bunch, Wendy
Sent: Tuesday, August 11, 2009 11:36 AM
To: bpcs-l@xxxxxxxxxxxx
Subject: [BPCS-L] Costed Indented Boms
BPCS v8.2.1 Wanted: Costed Indented Bom that I can get to excel...
Why would CST280 not offer method codes? It pulls directly from the
blank - My frozen standards are in FS - blank is our "production" method
code that will become next years Frozen Standard. CST300 option 15 is
the same.
I have showcase and can run and modify the MBM files add in IIM and CMF
- but I want a fully indented bom that I can send out - especially to
Sales and upper management. With the flexibility to change Cost sets and
method codes (actual purchase costs vs frz std, or working on the next
years standards)
We have had Network programmers write programs that basically took the
MBM, FRT & CMF files to a data base - but it had trouble with all the
loops to get a fully indented/costed bom. Plus the database was static -
would have to be reloaded before running reports. Another Excel guru
wrote some macros & used showcase and a spiffy excel database - but it
only went down 3 levels and stopped - and again had to have the "data"
refreshed to stay current. Leaving out the average user I'd like to
target....
What do you use?
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact
[javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.