To all:
Although I am sure we have covered this in other emails, I do not
see an easy explanation of what is a previous level and this level
costs. I am on 4.05cd. I created a new item with a Bill of
Material and a router. The material costs went into the previous
level bucket and the other setup, overhead, and outside process went
into the current level. But I have many purchased parts with only
material cost in the current level bucket. I also have parts with
both a current level and previous level for material costs. These
costs appear to be in error. I am writing to hopefully save me some
time, so that I do not have to delve into CST600 and figure out what
goes into each level. Please help if you can. Thanks
Matthew Bonus
I/S Manager
Truarc Company LLC
Email: mbonus@xxxxxxxxxx
--
This is the BPCS ERP System (BPCS-L) mailing list
To post a message email: BPCS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/bpcs-l.
Delivered-To: macwheel99@xxxxxxxxxx
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2026 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.