|
New question... We are trying to set up standards for items that use the same work center. The catch is that if we are building item A it requires 2 people, if we build item B it requires 3 people (remember this is the same physical work center). The routing holds the pieces per hour that we can produce based on the number of people required to do the job. The work center holds the labor rate for that work center used for computing the standard cost. We were told to set up 2 different work centers so that the standard labor rates could be loaded differently based on the number of people. Work center 1 would have the labor rate for 2 people and work center 2 the labor rate for 3 people. Item A routing would use work center 1 and Item B routing would use work center 2. Now when we run capacity gen...the system sees this as 2 separate fully capable work centers (we have basically doubled the capacity of this physical work center, when in fact we can't run both at the same time.) How can we satisfy the requirements for the standard cost roll-up by item without affecting the capacity? Any ideas? Beth A. Norris Production Control Manager Fawn Engineering Des Moines, IA bnorris@wittern.com +--- | This is the BPCS Users Mailing List! | To submit a new message, send your mail to BPCS-L@midrange.com. | To subscribe to this list send email to BPCS-L-SUB@midrange.com. | To unsubscribe from this list send email to BPCS-L-UNSUB@midrange.com. | Questions should be directed to the list owner: dasmussen@aol.com +---
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.