I'm still confused on a few items related to 5770-SS1 (Option 29)
1)
< There are no plans to support IBM i 7.3.
Why was a V7R3 version included?
2) Are there code or objects included in option 29 that are used by NWS.
Because the NWS were varied on, (accidently) option 29 failed to install.
When I varied off the NWS, option 29 installed with no issue.
My R&D LPAR didn't have any NWS, option 29 installed without issue.
3) < This is not needed for guested lpars.
What about hosted lpars?
Paul
-----Original Message-----
From: MIDRANGE-L [mailto:midrange-l-bounces@xxxxxxxxxxxx] On Behalf Of Rob Berendt
Sent: Tuesday, March 06, 2018 8:49 AM
To: Midrange Systems Technical Discussion
Subject: Re: V7R1 to V7R3 upgrade issues/resolutions
<snip>
5770-SS1 (Option 29) Integrated Server Support The IBM i Integrated Server solution will only be supported with the hardware and operating system versions that are currently listed in the iSCSI Solution Guide.
There are no new planned enhancements to the IBM i Integrated Server product.
There are no plans to support any new System x hardware.
There are no plans to support any non-IBM hardware.
There are no plans to support IBM i 7.3.
</snip>
This is not needed for guested lpars.
http://www-01.ibm.com/support/docview.wss?uid=nas8N1022036
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1 Group Dekko Dept 1600 Mail to: 2505 Dekko Drive
Garrett, IN 46738
Ship to: Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
From: "Steinmetz, Paul" <PSteinmetz@xxxxxxxxxx>
To: "'Midrange Systems Technical Discussion'"
<midrange-l@xxxxxxxxxxxx>
Date: 03/05/2018 04:42 PM
Subject: V7R1 to V7R3 upgrade issues/resolutions
Sent by: "MIDRANGE-L" <midrange-l-bounces@xxxxxxxxxxxx>
1) RPC not working on V7R3
Resolution:
IBM created PTF MF64720 to resolve the issue.
2) 5770SS1 29 Integrated Server Support failed to install.
I had 5 NWS, which I varied off prior to the PWRDWNSYS DELAY(60)
RESTART(*YES) IPLSRC(*IMGCLG) IMGCLG(V7R3OSPTF).
These varied on automatically, causing option 29 install to fail.
What I forgot to do is set these to *NO on IPL
Online at IPL . . . . . . . . . . : *YES (should have been set to *NO
just for the upgrade)
Resolution:
Varied them off.
RSTLICPGM LICPGM(5770SS1) DEV(OPTVRT01) OPTION(29)
3) VIP DocManager not working.
OS upgrade changed public authority from *USE to *EXCLUDE for system
object QPMLPMGT. This object is used to confirm license product
information.
Resolution:
Changed public authority to *USE for system object QPMLPMGT.
4) Spoolfiles being emailed were being rotated.
This should have been included as part of customization but was
overlooked.
Resolution:
CHGPRTF *all/all q libraries Degree of page rotation . . . . *AUTO
V7R3 Default was *DEVD.
Other than the above,
Smooth upgrade using combined V7R3OSPTF DSLO image, single image called
I_BASE_01.
All license keys and customization was included as part of the image.
Total time - 4 hours.
Save prior - 1 hour.
Upgrade - 45 minutes.
Upgrade check, resolution fixes, few remaining PTFs, IPL, - 1hour.
Save after - 1 hour.
Thank You
_____
Paul Steinmetz
IBM i Systems Administrator
Pencor Services, Inc.
462 Delaware Ave
Palmerton Pa 18071
610-826-9117 work
610-826-9188 fax
610-349-0913 cell
610-377-6012 home
psteinmetz@xxxxxxxxxx<mailto:psteinmetz@xxxxxxxxxx>