× The internal search function is temporarily non-functional. The current search engine is no longer viable and we are researching alternatives.
As a stop gap measure, we are using Google's custom search engine service.
If you know of an easy to use, open source, search engine ... please contact support@midrange.com.



I do a LOT of PTFs and spoken to many of the fine folks at IBM re PTFs and the process.

First off it has been stated that MANY PTFs simply require an IPL. The objects being replaced simply cannot be updated at any other time as they are always in use or otherwise locked. A claim of 90% of PTFs can be applied immediately doesn't align with what I see. I suppose it's possible in fact but with all the pre and co requisite PTFs all it takes is one PTF in the 'set' to require an IPL and the other PTFs are stuck so effectively all the PTFs require an IPL.

I have heard several times that using *IMMDLY (Immediate if possible, Delayed to IPL when mandatory) Is NOT recommended for any PTF Groups including CUMEs. It's essentially impossible to read every cover letter and deal with all the special instructions. Failure to follow the special instructions can mean many things, not the least of which is that many of the PTFs that APPEAR to be applied are not active until an action is taken, frequently the action is to IPL (which I find annoying!)

I do concur with other comments that if you are not provided sufficient time for backups, PTFs, and other maintenance then having an HA system is near mandatory. Clearly NOT doing PTFs and proper saves is just a system crash looking for a bad time to occur. If time is so short when you DO get a window that any problems push you into being considered an outage that also is 'living on the edge'. Also consider making your load source disk an SSD, this will 'enhance PTF apply performance.'

Generally I do like load and run Temp and SAVE 22. Run for perhaps 2 or 3 months. Then perm apply all and SAVE 22. Then repeat as necessary.

- Larry "DrFranken" Bolhuis

www.frankeni.com
www.iDevCloud.com
www.iInTheCloud.com

On 6/4/2014 11:56 AM, Steinmetz, Paul wrote:

Management would like to minimize the IPL, PTF, and system save downtimes.
HA/DR Is out of the question.
Currently, I try to IPL Production every 2 months for PTF apply along with a system save.
The IPL and system save will probably go to 6 months or as needed.
90% of PTFs can be applied immediately without an IPL, however IBM does not recommend immediate apply for more than a single PTF.
Applying a large amount of PTFs immediately has caused issues in the past.
Permission has been granted for the PTF immediate apply, but I'm weary from previous issues.

Any thoughts from the group.

Thank You
_____
Paul Steinmetz
IBM i Systems Administrator

Pencor Services, Inc.
462 Delaware Ave
Palmerton Pa 18071

610-826-9117 work
610-826-9188 fax
610-349-0913 cell
610-377-6012 home

psteinmetz@xxxxxxxxxx
http://www.pencor.com/


As an Amazon Associate we earn from qualifying purchases.

This thread ...

Follow-Ups:
Replies:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.