We use MPLUS to send messages and email on job statuses. It can be
setup to monitor for job start and compilation times along with any
errors or abnormal termination.

Kirk Goins <kirkgoins@xxxxxxxxx> 1/28/2013 3:38 PM >>>
I was hoping not to code anything into existing programs etc. Was
wondering how much of this could be dome by using the Advanced Job
Scheduler, or do we need something Like Robot whatever.?

On Mon, Jan 28, 2013 at 3:26 PM, Vernon Hamberg

Hi Kirk

There are messages in the history log that contain the first 2 items
CPF1164 has it, although some is kind of hidden. I wonder if
doesn't have something to help analyze this.

There is also a job status exit point that can call a program when
change status - something like that - not sure if it'd take care of
number 3. It'd also take care of the first 2, I think.


On 1/28/2013 5:05 PM, Kirk Goins wrote:
What are folks using these days to
#1 Track Job Start and End Times
#2 Job Completion Status
#3 Email when jobs hang or end abnormally?

This is the Midrange Systems Technical Discussion (MIDRANGE-L)
mailing list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.

This thread ...


Return to Archive home page | Return to MIDRANGE.COM home page