|
|
|
If I remember right from a long time ago with an implementation of this typeof scenario with a 3582 that only had 2 I/O slots. To make it work you could
cartridge location but not eject the tape, send a report of what tapes are to
Otherwise, you could just use the media movement process to change the
waiting for the operator.
Again, not a smooth solution as just having the cartridges in the I/O station
could append the data to the end of the tape (unless each save is a full
Are the tapes full or is this a multiple system/partition backup? Maybe you
On Behalf Of lgoodbar@xxxxxxxxxxxxxx
Patrick Bingham
Power Systems Solutions Engineer
IBM Certified Advanced Technical Expert - Power Systems with IBM i
MSI Systems Integrators
(w) 402.965.2381
(c) 402.212.2944
(f) 402.965.2414
Your Business.Better
-----Original Message-----
From: midrange-l-bounces@xxxxxxxxxxxx [mailto:midrange-l-bounces@xxxxxxxxxxxx]
Sent: Friday, June 05, 2009 3:31 PMit just with the TS3100 or any unit
To: midrange-l@xxxxxxxxxxxx
Subject: RE: BRMS, TS3100 and being totally ridiculous
What does IBM say on the subject? Is
with a mail slot?
I do not have a single-feed unit. We use a 3581 (7 slots with 1 occupied
with barcode reader). The front panel opens to access the front 5 slots,
the other 2 slots are accessed via front slots 1/2 or 2/3 (if using
barcode reader). The BRMS move operation never attempts to eject the
tapes.
For what it's worth, our move policy "Verify moves" value is *YES:
*YES
Media moves performed for this move policy by the Move Media
using BRM (MOVMEDBRM) command must be verified by you.
*NO
Media moves performed for this move policy by the Move Media
using BRM (MOVMEDBRM) command are automatically verified by
BRMS.
Now our Windows servers tape drive is a PITA to use, just as you
describe. The backup software (I forget the name) makes you eject 1 tape
at a time, and you have to wait for it to deliver it to the mail slot.
Sorry I could not help more....
Loyd
-----Original Message-----
From: midrange-l-bounces@xxxxxxxxxxxx
[mailto:midrange-l-bounces@xxxxxxxxxxxx] On Behalf Of Jerry Draper
Sent: Friday, June 05, 2009 12:44 PM
To: Midrange Systems Technical Discussion
Subject: BRMS, TS3100 and being totally ridiculous
The lack of integration between IBM's BRMS and the IBM TS3100 tape
magazine/drive (24 slots) makes for an awkward system that cannot be
automated.
BRMS is setup with a move policy that runs on Friday mornings. We move
tapes once per week. Eligible tapes need to have their locations
changed in the BRMS database from TAPMLB02 to OFFSITE. A movement
report needs to tell the operator which tapes to remove from the system.
Wouldn't it be nice if it worked seamlessly?
Running tape movement causes a tape error because only one tape can be
"ejected" from the TS3100 at a time. You just can't move tapes in BRMS
without the system trying to eject the tapes.
This mailing list archive is Copyright 1997-2010 by MIDRANGE dot COM and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available here. If you have questions about this, please contact