Matthias Oertli wrote:
> Hi,
> When installing a CUM tape, the docs mention two IPL's one to the A-side and
> another to the B-side.
>
> I am just curious what the second IPL to the A-side did. I checked my manuals
> for C600 434B but could not find any reference to it.
> Could anyone shed some light on this?
>
> Thanks,
> Matthias
Installing to the B side is the temporary application of the cums. If you are
a naturally worried
person and/or have been burned before by upgrades you will stop right there
and run from the B side
for a few weeks, or at least until you see how everything goes. Later on when
things are settled
you can then apply the cums to the A side making the install permanent.
At leeast that's how I look at it.
+---
| This is the Midrange System Mailing List!
| To submit a new message, send your mail to "MIDRANGE-L@midrange.com".
| To unsubscribe from this list send email to MIDRANGE-L-UNSUB@midrange.com.
| Questions should be directed to the list owner/operator: david@midrange.com
+---